Contract notice

Information

Published

Date of dispatch of this notice: 01/08/2019

Expire date: 02/09/2019

External Reference: 2019-282969

TED Reference: 2019/S 149-366610

Contract notice

[NoticeContract]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Office of Public Works (OPW)
N/A
Flood Projects Management Services, 52 St. Stephen's Green,
Dublin 2
D02DR67
IE
[Contactpoint]: Seán Fitzgerald
[AddressPhone]: +353 16476684
[AddressEmail]: sean.fitzgerald@opw.ie
[Internets]:
[UrlGeneral]: http://www.opw.ie

I.2)

[JointProcurement]

[JointProcurementCentral]
I.3)

[InfoTendering]

[AddressObtainDocs]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=151623&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[MaintypeMinistry]
I.5)

[Mainactivity]

[MainactivGeneral]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Supply and delivery of embankment fill material to the Morell River Flood Management Scheme, Turnings Lower, North Naas, Bodenstown, Co. Kildare
[Fileref]:  C86/24/12/6
II.1.2)

[CpvMain]

44110000  - 
II.1.3)

[TypeContract]

[Supplies]
II.1.4)

[DescrShort]

The specification covers the Contractor’s requirements for the supply and delivery of material suitable for the construction of impermeable earthen embankments as part of the Morell River Flood Management Scheme. Where possible the material will be delivered to the site of the earthen embankment and deposited there. Alternatively, at the decision of OPW Site Supervisory Staff, the material may be deposited at designated stockpile locations.
A non-technical description of the required material is as follows:
A sub-soil material suitable for the construction of a homogenous earthen embankment. The material shall be an impermeable fine-grained cohesive soil, with a suitable moisture content that shall be capable of reasonable compaction. No rocks greater than 75mm in size shall be permitted in the soil. No organic material will be accepted.
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 335000.00  EUR
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

44100000  - 
44111000  - 
44140000  - 
44190000  - 
44192000  - 
44420000  - 
45220000  - 
II.2.3)

[PlacePerformance]

[MainsiteplaceWorksDelivery]:  
52 St. Stephen's Green, Dublin 2 D02 DR67
II.2.4)

[DescrProcurement]

The specification covers the Contractor’s requirements for the supply and delivery of material suitable for the construction of impermeable earthen embankments as part of the Morell River Flood Management Scheme. Where possible the material will be delivered to the site of the earthen embankment and deposited there. Alternatively, at the decision of OPW Site Supervisory Staff, the material may be deposited at designated stockpile locations.
A non-technical description of the required material is as follows:
A sub-soil material suitable for the construction of a homogenous earthen embankment. The material shall be an impermeable fine-grained cohesive soil, with a suitable moisture content that shall be capable of reasonable compaction. No rocks greater than 75mm in size shall be permitted in the soil. No organic material will be accepted.
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 335000.00  EUR
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 36
[RenewalsSubject]: [Yes]
[RenewalsDescr]:  
Two possible renewals of six months each.
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.1)

[SituationPersonalIncl]

[InfoEvaluatingRequir]:  As stated in the procurement documents available to download from www.etenders.gov.ie using RFT ID 155172.
III.1.2)

[EconomicFinancialStanding]

[CriteriaSelectionDocs]
III.1.3)

[TechnicalCapacity]

[CriteriaSelectionDocs]
III.2)

[ConditionsContract]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  02/09/2019
[Time]:  12:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 6  ([FromStatedDate])
IV.2.7)

[OpeningConditions]

[Date]:  02/09/2019
[Time]:  12:00

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.3)

[InfoAdditional]

1) Interested parties must register their interest on the etenders website in order to be included on the mailing list for clarifications. All information relating to attachments, including clarifications and changes, will be published on the Irish Government Procurement Opportunities Portal (www.etenders.gov.ie) only. The contracting authority will not accept responsibility for information relayed (or not) via third parties.
2) This is the sole call for competition for this Contract.
3) The contracting authority will not be responsible for any costs, charges or expenses incurred by candidates or tenderers.
4) Contract award will be subject to approval of the competent authorities.
5) It will be a condition of the award that the tenderer is and remains tax compliant.
6) At its absolute discretion, the contracting authority may elect to terminate this procurement process or any contract awarded under the agreement at any time.
7) Please note that in relation to all documents, where reference is made to a particular standard, make, source, process, trademark, type or patent, that this is not to be regarded as de facto requirement. In all such cases it should be understood that such indications are to be treated strictly and solely for reference purposes only,to which the words "or equivalent" will always be appended.
8) Without prejudice to the principle of equal treatment, the contracting authority is not obliged to engage in a clarification process in respect of the procurement documents with missing or incomplete information. Therefore, respondents are advised to ensure that they return completed documentation in order to avoid the risk of elimination from the competition.
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

High Court
Inns Quay,
Dublin 7
IE