Date of dispatch of this notice: 17/05/2019

External Reference: 2019-266280

TED Reference: 2019/S 097-233681

Corrigendum

[NoticeCorrigendum]

[NoticeCorrigendumSub]

[Works]

[Directive201424]

[Section1]: [CaCe]

I.1)

[NameAddressContact]

Transport Infrastructure Ireland (TII)
9510201H
Parkgate Business Centre, Parkgate Street
Dublin, D08 DK10
Dublin
IE
[Contactpoint]: Micheal O'Connor
[AddressPhone]: +353 16463692
[AddressEmail]: procurement@tii.ie
[Internets]:
[UrlGeneral]: www.tii.ie

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

MetroLink Utility Investigation Framework
[Fileref]:  TII201
II.1.2)

[CpvMain]

45111250  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

TII has a requirement for a contractor to carry out site investigations in order to provide information in respect of existing underground utilities (services) to inform the Preliminary Design and Environmental Impact Assessment for the MetroLink project. The non-intrusive underground utility investigations shall be carried out to the PAS 128:2014 Survey Level B1P and to a detection method of M1P, M2P, M3P and M4P. A combination of manhole inspection, Electro Magnetic Location (EML) and Ground Penetrating Radar (GPR) is to be used to complete the non-intrusive utility mapping survey of all underground services. Other survey technologies can be used subject to Investigation Supervisor’s approval.
Due to the volume of the investigations required it is proposed to award the works in three lots.

[Section6]: [InfoComplement]

VI.6)

[IcarOriginalRef]

[NumberOj]: 2019/S 079-188986

[Section7]: [Changes]

VII.1)

[IcarCorrectAdd]

VII.1.2)

[IcarTextCorrected]

[SectionNo]:  IV.2.2
[IcarTextCorrPlace]:  Date
[IcarInstead]:  
[Date]:  21/05/2019
[Time]:  12:00
[IcarRead]:  
[Date]:  31/05/2019
[Time]:  12:00

[SectionNo]:  IV.2.7
[IcarTextCorrPlace]:  Date
[IcarInstead]:  
[Date]:  21/05/2019
[Time]:  12:00
[IcarRead]:  
[Date]:  31/05/2019
[Time]:  12:00