Contract award notice

Information

Published

Date of dispatch of this notice: 18/06/2019

External Reference: 2019-222649

TED Reference: 2019/S 116-285375

Contract award notice

[NoticeContractAward]

[NoticeContractAwardSub]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Lahinch Seaworld PLC
08223647Q
The Promenade, Lahinch
Lahinch
Co.Clare
IE
[Contactpoint]: Joe Garrihy
[AddressPhone]: +353 0657081800
[AddressEmail]: joeg.seaworld@gmail.com
[Internets]:
I.2)

[JointProcurement]

[JointProcurementCentral]
I.4)

[CaType]

[MaintypePublicbody]
I.5)

[Mainactivity]

[MainactivCulture]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Design Consultancy Services Lahinch Sea World and Leisure Centre
[Fileref]:  147840
II.1.2)

[CpvMain]

71220000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

Lahinch Sea World and Leisure Centre (the “Authority”) now wish to
appoint a design team for Extension and Refurbishment Works at Lahinch
Sea World and Leisure Centre. The following design team services
are required;
Lot 1: Integrated Design Team.
Lot 2: Project Manager and Quantity Surveyor
Consultants for Lot 1 must include as part of their Application the following principal services:
1. Lead Designer
2. Architect
3. Civil / Structural Engineer
4. Mechanical & Electrical Engineer
5. Renewable Technologies and NZEB Consultant
6. PSDP
II.1.6)

[LotsInfo]

[DivisionLots]: [Yes]
II.1.7)

[ValueTotal]

[ValueExclVat]:  200000.00  EUR
II.2)

[Description]

II.2.1)

[TitleContract]

Integrated Design Team
[LotNumber]:  1
II.2.2)

[CpvAdditional]

71200000  - 
71311000  - 
71317200  - 
71334000  - 
71356000  - 
71521000  - 
II.2.3)

[PlacePerformance]

[MainsiteplaceWorksDelivery]:  
Lahinch, Co Clare
II.2.4)

[DescrProcurement]

Extension and Refurbishment Works at Lahinch Sea World and Leisure Centre
II.2.5)

[AwardCriteria]

[AwardCriteriaBelow]
[AwardCriterionQuality]  -  [AwardCriterionName]:  Human Resources  /  [Weighting]:  350
[AwardCriterionQuality]  -  [AwardCriterionName]:  Design Approach  /  [Weighting]:  250
[AwardCriterionQuality]  -  [AwardCriterionName]:  Project Methodology / Delivery  /  [Weighting]:  100
[Price]  -  [Weighting]:  300
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [Yes]
[EuProgrRef]: Rural Regeneration and Development Fund
II.2)

[Description]

II.2.1)

[TitleContract]

Project Manager & Quantity Surveyor
[LotNumber]:  2
II.2.2)

[CpvAdditional]

71244000  - 
71324000  - 
71541000  - 
II.2.3)

[PlacePerformance]

[MainsiteplaceWorksDelivery]:  
Lahinch, Co Clare
II.2.4)

[DescrProcurement]

Extension and Refurbishment Works at Lahinch Sea World and Leisure Centre
II.2.5)

[AwardCriteria]

[AwardCriteriaBelow]
[AwardCriterionQuality]  -  [AwardCriterionName]:  Human Resources  /  [Weighting]:  300
[AwardCriterionQuality]  -  [AwardCriterionName]:  Project Management/Cost Management/Control  /  [Weighting]:  250
[AwardCriterionQuality]  -  [AwardCriterionName]:  Methodology and Approach  /  [Weighting]:  150
[Price]  -  [Weighting]:  300
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [Yes]
[EuProgrRef]: Rural Regeneration and Development Fund

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.1)

[PubPrevious]

[NumberOj]: 2019/S 056-129674

[Section5]: [AwardOfContract]

[ContractNumber]: 1

[LotNumber]: 1

[TitleContract]: Integrated Design Team

[AwardConfirm]: [Yes]
V.2)

[AwardOfContract]

V.2.1)

[DateAward]

31/05/2019
V.2.2)

[AwardOffersInfo]

[OffersReceived]:  2
[AwardedGroup] :  [No]
V.2.3)

[AwardedToName]

McKenna Consulting Engineers
Bank Place
Miltown Malbay, Co Clare
IE

[AwardedSme] : [Yes]
V.2.4)

[ValueContractInfo] ([ExclVat])

[ValueTotalFinal]:  150000.00  EUR

[Section5]: [AwardOfContract]

[ContractNumber]: 2

[LotNumber]: 2

[TitleContract]: Project Manager and Quantity Surveyor

[AwardConfirm]: [Yes]
V.2)

[AwardOfContract]

V.2.1)

[DateAward]

13/05/2019
V.2.2)

[AwardOffersInfo]

[OffersReceived]:  2
[AwardedGroup] :  [No]
V.2.3)

[AwardedToName]

Tom McNamara & Partners
57 Parnell Street
Ennis
IE

[AwardedSme] : [Yes]
V.2.4)

[ValueContractInfo] ([ExclVat])

[ValueTotalFinal]:  50000.00  EUR

[Section6]: [InfoComplement]

VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

The High Court of Ireland
High Court Central Office, Four Courts, Inns Quay
Dublin
IE