II.1)
[QuantityScopeContract]
Construction of a food Innovation and Incubator Hub Campus
[Fileref]:
Shortlisting Contractor 0219
[Works]
Construction of a food innovation and incubator hub
campus at Mellows, Teagasc Campus, Athenry, Co.
Galway. The Campus consists of the construction of
3 separate buildings: Building 1 - BIA EOLAS/BIA
OBAIR - construction of a 2 storey Learning Centre
(1200m2 Gross Floor Area). Building 2 H.P.S.U.
units - construction of a single storey building
(700m2 Gross Floor Area). Building 3 - Incubation
Units- single storey building (700m2 Gross Floor
Area) and general site works
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 5500000.00
EUR
[DivisionLots]:
[No]
45300000
-
45232452
-
45342000
-
45310000
-
45112000
-
45113000
-
45350000
-
45200000
-
45000000
-
45210000
-
II.2.4)
[DescrProcurement]
Construction of a food innovation and incubator hub
campus at Mellows, Teagasc Campus, Athenry, Co.
Galway. The Campus consists of the construction of
3 separate buildings: Building 1 - BIA EOLAS/BIA
OBAIR - construction of a 2 storey Learning Centre
(1200m2 Gross Floor Area). Building 2 H.P.S.U.
units - construction of a single storey building
(700m2 Gross Floor Area). Building 3 - Incubation
Units- single storey building (700m2 Gross Floor
Area) and general site works
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 5500000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
12
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]