Contract award notice - utilities

Information

Published

Date of dispatch of this notice: 17/07/2019

External Reference: 2019-289224

TED Reference: 2019/S 137-338462

Contract award notice - utilities

[NoticeAwardUtilities]

[NoticeContractAwardSub]

[Works]

[Directive201425]

[Section1]: [Ce]

I.1)

[NameAddressContact]

Irish Water
The Shared Services Procurement Manager, Ervia , P
Cork
Co.Cork
IE
[Contactpoint]: Tender Admin
[AddressPhone]: +353 214239083
[AddressEmail]: tenders@ervia.ie
[Internets]:
[UrlGeneral]: https://www.water.ie/

I.6)

[Mainactivity]

[MainactivWater]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Galway City Water Conservation Stage 3, Watermain Rehabilitation Works – Phase 1
[Fileref]:  16/090
II.1.2)

[CpvMain]

44161200  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

Irish Water plan to undertake the rehabilitation of approximately 20km of existing watermains in Galway City, Ireland together with the transfer of approximately 2,400no. connections to the new main.
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

45232100  - 
45232150  - 
45232151  - 
45240000  - 
65110000  - 
65111000  - 
II.2.4)

[DescrProcurement]

The Galway City Water Conservation Stage 3 Watermain Rehabilitation Works Phase 1 will involve the following:
• Contractor design & construction of approximately 20km of new watermains to replace existing cast iron, asbestos cement, pvc, mdpe and lead watermains including all ancillary works;
• The watermains will range in diameter from 110mm OD (100mm DN) to 280mm OD (250mm DN);
• The transfer of approximately 2,400no. existing connections to the new main;
• Approximately 750no. of the existing connections are backyard services to be transferred to the new watermains to the front of the properties;
• Works will take place across and in close proximity to protected structures at several locations;
• Works will take place in close proximity to 2no. Special Areas of Conservation;
• Contaminated land may be encountered during the works;
• Very heavy traffic conditions are expected at several of the proposed works locations;
• It is expected that the use of trenchless techniques such as pipe bursting and horizontal directional drilling may be viable in certain areas, as well as open cut techniques in areas where trenchless techniques are not viable.
Further details of the scope of works and phasing of the works are included in the Pre-Qualification Questionnaire.
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2.14)

[InfoAdditional]

The prequalification questionnaire is available on etenders (http://etenders.gov.ie/).
All queries for clarification must be submitted via email for the attention of The Shared Services Procurement Manager to Tenders@ervia.ie .
The questionnaire must be completed and returned to the address in I.1. above not later than 12.00hrs Tuesday 21st June 2016.

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeNegotWCall]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.1)

[PubPrevious]

[NumberOj]: 2016/S 094-168754

[Section5]: [AwardOfContract]

[ContractNumber]: 1

[TitleContract]: Galway City Water Conservation Stage 3 Watermain Rehabilitation Works – Phase 1

[AwardConfirm]: [Yes]
V.2)

[AwardOfContract]

V.2.1)

[DateAward]

19/04/2018
V.2.2)

[AwardOffersInfo] ( [HAgreeToPublish] [Yes] )

[OffersReceived]:  5
[AwardedGroup] :  [No]
V.2.3)

[AwardedToName] ( [HAgreeToPublish] [Yes] )

ShareRidge Ltd
Mayo
IE

[AwardedSme] : [Yes]

[Section6]: [InfoComplement]

VI.3)

[InfoAdditional]

The prequalification questionnaire is available only on etenders (http://etenders.gov.ie/) please register your interest on etenders to access the documents.
All queries for clarification must be submitted via email for the attention of The Shared Services Procurement Manager to Tenders@ervia.ie
The completed questionnaire must be completed and returned to the address in I.1. above not later than 12.00hrs Tuesday 21st June 2016.
Please include the tender reference in all communications.
The Questionnaire will cover the financial, economic and technical capacity of candidates.
The responses will be used to assist in drawing up a tender list. This process may also include interviews with candidates. The contracting entity will not be responsible for any costs, charges or expenses incurred by candidates or tenderers relating to this contract award procedure.
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

The High Court
High Court Central Office, Four Courts, Inns Quay,
Dublin 1
IE
[AddressPhone]: +00 35318886000

VI.4.3)

[AppealsLodging]

[AppealsDeadline]: 
Interested parties are referred to Statutory Instrument 131 of 2010, European Communities (Award of Contracts by Utility Undertaking) (Review Procedures) Regulations 2010 (and in particular Regulation 7 and 10(2).