II.1)
[QuantityScopeContract]
RFI for Standard 3 Hold Baggage Screening Upgrade Project at Shannon Airport
[Works]
Shannon Airport Authority DAC wishes to procure the services of a Multi-Discipline Contractor for the purpose of Design, Installation, Integration, Validation and Certification of the delivery of a compliant Standard 3 Hold Baggage Screening System Upgrade at Shannon Airport.
The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a Standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 9000000.00
EUR
[DivisionLots]:
[No]
34960000
-
42417200
-
71000000
-
71200000
-
71220000
-
71221000
-
71223000
-
71300000
-
71310000
-
71311000
-
71311100
-
71311300
-
71312000
-
71315000
-
71315100
-
71315200
-
71315210
-
71320000
-
71540000
-
71541000
-
72224000
-
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Shannon
II.2.4)
[DescrProcurement]
Shannon Airport Authority DAC wishes to procure the services of a Multi-Discipline Contractor for the purpose of Design, Installation, Integration, Validation and Certification of the delivery of a compliant Standard 3 Hold Baggage Screening System Upgrade at Shannon Airport.
The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a Standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
The project comprises any displacement relocation or construction works required to deliver a compliant system and should allow for the removal of the existing Standard 2 Screening Equipment at the airport, which comprises a sum of 2 standard lines and one out of gauge machine.
The upgraded Standard 3 Hold Baggage Screening System should be fully operational in advance of the 01 September 2020 deadline.
A full performance specification will be provided at Stage 2 -RFT.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 9000000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
18
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[Yes]
[Options]:
[No]
[EuProgrRelated]:
[No]