Contract notice - utilities

Information

Published

Date of dispatch of this notice: 25/09/2018

Expire date: 26/10/2018

External Reference: 2018-252908

TED Reference: 2018/S 188-425599

Contract notice - utilities

[NoticeContractUtilities]

[Works]

[Directive201425]

[Section1]: [Ce]

I.1)

[NameAddressContact]

Iarnrod Eireann-Irish Rail
N/A
Procurement, Engineering & New Works,
Dublin 8
Inchicore
IE
[Contactpoint]: Martin Egan
[AddressPhone]: +353 17031761
[AddressEmail]: martin.egan@irishrail.ie
[Internets]:
I.3)

[InfoTendering]

[DocsRestricted]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=135745&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressToAbove]
I.6)

[Mainactivity]

[MainactivRailway]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

CONSTRUCTION OF A NEW RAILWAY STATION AND PEDESTRIAN FOOTBRIDGE OVER THE ROYAL CANAL AT PELLETSTOWN
[Fileref]:  7071
II.1.2)

[CpvMain]

45213321  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

This is a call to competition by IE to award a contract for the construction of a new railway station at Pelletstown, located mid-way between Broombridge and Ashtown Stations on the Connolly to Maynooth Line, plus the construction of a pedestrian footbridge with access steps and ramps over the Royal Canal.
It is anticipated that works will commence on site in May 2019, with an estimated completion date of November 2020.
A PRE-QUALIFICATION QUESTIONNAIRE IS ATTACHED TO THIS NOTICE AND MUST BE DOWNLOADED, REVIEWED, COMPLETED AND RETURNED AS DIRECTED BY ALL INTERESTED APPLICANTS.
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

45213321  - 
II.2.3)

[PlacePerformance]

[MainsiteplaceWorksDelivery]:  
Pelletstown, Dublin 7
II.2.4)

[DescrProcurement]

This is a call to competition by IE to award a contract for the construction of a new railway station at Pelletstown, located mid-way between Broombridge and Ashtown Stations on the Connolly to Maynooth Line, plus the construction of a pedestrian footbridge with access steps and ramps over the Royal Canal.
It is anticipated that works will commence on site in May 2019, with an estimated completion date of November 2020.
A PRE-QUALIFICATION QUESTIONNAIRE IS ATTACHED TO THIS NOTICE AND MUST BE DOWNLOADED, REVIEWED, COMPLETED AND RETURNED AS DIRECTED BY ALL INTERESTED APPLICANTS.
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 18
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.2)

[EconomicFinancialStanding]

[InfoEvaluatingWethRequir]:  
SEE ATTACHED PQQ DOCUMENT
III.1.3)

[TechnicalCapacity]

[InfoEvaluatingWethRequir]:  
SEE ATTACHED PQQ DOCUMENT
III.1.4)

[ParticipationRules]

[DescrBriefRules]: SEE ATTACHED PQQ DOCUMENT
III.1.8)

[LegalFormTaken]

A grouping if successful must be prepared to contract as a single entity having joint and several liability with the members of the group. It will become necessary for the group to state a single addressee responsible for the receipt and processing of the participating orders and resolving any problems relating to the contract.
III.2)

[ConditionsContract]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeNegotWCall]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  26/10/2018
[Time]:  12:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

The High Court
Court Chief Registrar, Four Courts,
Inns Quay
Dublin 7
IE
[AddressPhone]: +353 18886000