Contract notice - utilities

Information

Published

Date of dispatch of this notice: 28/08/2018

Expire date: 01/10/2018

External Reference: 2018-053481

TED Reference: 2018/S 166-379386

Contract notice - utilities

[NoticeContractUtilities]

[Services]

[Directive201425]

[Section1]: [Ce]

I.1)

[NameAddressContact]

EirGrid plc
N/A
Block 2 - The Oval, 160 Shelbourne Road
Ballsbridge
Dublin 4
IE
[Contactpoint]: Anthony Flood
[AddressPhone]: +353 012370123
[AddressFax]: +353 016615375
[Nutscode]:  IE -  IRELAND
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=134453&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.6)

[Mainactivity]

[MainactivElectricity]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

HVDC Technical Advisor for the Celtic Interconnector Project
[Fileref]:  ENQEIR636
II.1.2)

[CpvMain]

71300000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

The Scope of Requirements is expected to include, but is not limited to provision of support and advice across a number of work packages:
Work Package 1 (WP1) - Support EirGrid in the evaluation of potential HVDC technical solutions and prepare a technical report.
Work Package 2 (WP2) - Support EirGrid in the technical documentation preparation for EPC Contracts procurement
Work Package (WP3) – EPC Procurement Support from publication of OJEU Notice to Contract Award
Optional work packages
Work Package (WP4) – Owner’s Engineer - Technical Support post EPC Contract Award to Commissioning
Work Package (WP5) – Owner’s Engineer - Technical Support from Commissioning through to the Operation and Maintenance of the scheme
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 750000.00  EUR
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

71310000  - 
71320000  - 
71330000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE -  IRELAND
[MainsiteplaceWorksDelivery]:  
Ireland
II.2.4)

[DescrProcurement]

EirGrid requires the provision of technical advice and support for the development of the Celtic Interconnector project.
EirGrid intends to establish a single supplier framework. Once the Framework is in place, and as and when requirements arise, contracts will be awarded to the framework member.
The Scope of Requirements is expected to include, but is not limited to provision of support and advice across a number of work packages: Work Package 1 (WP1) - Support EirGrid in the evaluation of potential HVDC technical solutions and prepare a technical report. Work Package 2 (WP2) - Support EirGrid in the technical documentation preparation for EPC Contracts procurement Work Package (WP3) – EPC Procurement Support from publication of OJEU Notice to Contract Award Optional work packages Work Package (WP4) – Owner’s Engineer - Technical Support post EPC Contract Award to Commissioning Work Package (WP5) – Owner’s Engineer - Technical Support from Commissioning through to the Operation and Maintenance of the scheme
See the Information Memorandum and Pre-Qualification Questionnaire for full details. This is attached to the etenders notice for this tender at http://www.etenders.gov.ie/
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 750000.00  EUR
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 96
[RenewalsSubject]: [No]
II.2.9)

[LimitOperators]

[EnvisagedNumber]: 5
[CriteriaChoosingLimited]:
See the Information Memorandum and Pre-Qualification Questionnaire for full details. This is attached to the etenders notice for this tender at http://www.etenders.gov.ie/
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
See the Information Memorandum and Pre-Qualification Questionnaire for full details. This is attached to the etenders notice for this tender at http://www.etenders.gov.ie/
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [Yes]
[EuProgrRef]: Celtic Interconnector Project

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.1)

[SituationPersonalIncl]

[InfoEvaluatingRequir]:  See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
III.1.2)

[EconomicFinancialStanding]

[InfoEvaluatingWethRequir]:  
See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
[MinStandardsRequired]:  
See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
III.1.3)

[TechnicalCapacity]

[InfoEvaluatingWethRequir]:  
See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
[MinStandardsRequired]:  
See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
III.1.4)

[ParticipationRules]

[DescrBriefRules]: See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
III.1.6)

[DepositsRequired]

See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
III.1.7)

[FinancingConditions]

See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
III.1.8)

[LegalFormTaken]

See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
III.2)

[ConditionsContract]

III.2.2)

[OtherConditions]

See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeNegotWCall]
IV.1.3)

[FrameworkContractDpsInfo]

[FrameworkSingle]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  01/10/2018
[Time]:  12:00
IV.2.3)

[DateDispatchTenderParticipate]

[Date]: 18/10/2018
IV.2.4)

[LanguagesAllowed]

[Language_EN], [Language_GA]

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.3)

[InfoAdditional]

1) Interested parties must register their interest on the eTenders web site: http://www.etenders.gov.ie/ in order to be included on the mailing list for clarifications. All information relating to attachments, including clarifications and changes, will be published on the Irish Government Procurement Opportunities Portal: http://www.etenders.gov.ie/ only. Registration is free of charge. The contracting authority will not accept responsibility for information relayed (or not relayed) via third parties.
2) This is the sole call for competition for this service.
3) The contracting authority will not be responsible for any costs, charges or expenses incurred by candidates or tenderers.
4) Contract award will be subject to the approval of the competent authorities.
5) It will be a condition of award that candidates are tax compliant and are in a position to produce a valid tax clearance certificate or e-Tax Clearance from the Revenue Commissioners when requested.
6) If for any reason it is not possible to award the contract one or more of the tenderers invited following the conclusion of this competitive process, the contracting authority reserves the right to award the contract to the next ranked tenderer as appropriate.
7) At its absolute discretion, the contracting authority may elect to terminate this procurement process or any contract awarded.
8) Please note in relation to all documents, that where reference is made to a particular standard, make, source, process, trademark, type or patent, that this is not to be regarded as a de facto requirement. In all such cases it should be understood that such indications are to be treated strictly and solely for reference purposes only, to which the words ‘or equivalent’ will always be appended.
9) Without prejudice to the principle of equal treatment, the contracting authority is not obliged to engage in a clarification process in respect of questionnaires with missing or incomplete information. Therefore, candidates are advised to ensure that they return fully completed questionnaires in order to avoid the risk of elimination from the competition.
See attached Information Memorandum and Pre-Qualification Questionnaire for full details. This is available on etenders http://www.etenders.gov.ie/
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

The High Court
Four Courts
Dublin
7
IE
[AddressPhone]: +353 18886000

VI.4.3)

[AppealsLodging]

[AppealsDeadline]: 
Precise information on deadline(s) for review procedures:
Precise information on deadline(s) for review procedures:
Precise information on deadline(s) for lodging appeals: The contracting authority will not conclude this contract to which a standstill period applies in accordance with Irish Statutory Instrument SI 130 of 2010, until after the expiry of the standstill period which commences on the day following the date of notification on concerned candidates and tenderers. The duration of the standstill period will be 14 calendar days where notifications are sent electronically or by fax and 16 calendar days where these are sent by any other means. The Statutory Instrument mentioned above provides that review procedures are available in the High Court to a person who has or has had an interest in obtaining the reviewable public contract and alleges that he or she has been harmed or is at risk of being harmed by an infringement of the law in relation in this contract.