II.1)
[QuantityScopeContract]
Supply of HSFG Bolt Assemblies (System HR)
[Fileref]:
7106
[Supplies]
Iarnród Éireann require a supply of High-Strength Structural Bolting Assemblies for Preloading using System HR K0-Class bolt assemblies, each of which consists of four elements:
• System HR Hexagon Bolt Assemblies: BS EN 14399-3.
• System HR Hexagon Nut Assemblies: BS EN 14399-3.
• System HR Hexagon Bolt Assemblies – Plain Chamfered Washers: BS EN 14399-6 for G10.9 assemblies
• System HR Hexagon Bolt Assemblies – Direct Tension Indicators: BS EN 14399-9 - shall be marked with the identification mark of the manufacturer of the assembly
Interested candidates are required to download, complete and return the Pre Qualification Questionnaire attached to this Contract Notice in strict accordance with the instructions provided. All queries relating to this Notice and PQQ must be submitted in writing only to mark.gorman@irishrail.ie.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 150000.00
EUR
[DivisionLots]:
[No]
II.2.4)
[DescrProcurement]
Iarnród Éireann require a supply of High-Strength Structural Bolting Assemblies for Preloading using System HR K0-Class bolt assemblies, each of which consists of four elements:
• System HR Hexagon Bolt Assemblies: BS EN 14399-3.
• System HR Hexagon Nut Assemblies: BS EN 14399-3.
• System HR Hexagon Bolt Assemblies – Plain Chamfered Washers: BS EN 14399-6 for G10.9 assemblies
• System HR Hexagon Bolt Assemblies – Direct Tension Indicators: BS EN 14399-9 - shall be marked with the identification mark of the manufacturer of the assembly
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 150000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
36
[RenewalsSubject]:
[Yes]
[RenewalsDescr]:
Iarnród Éireann have an option to extend by 12 months/ 1 year at IE’s discretion, subject to the terms and conditions of the Contract. Contract would be renewed in 36 months or 48 months if extension is utilized
[VariantsAccepted]:
[No]
[Options]:
[Yes]
[OptionsDescr]:
Iarnród Éireannhave an option to extend by 12 months/ 1 year at IE’s discretion, subject to the terms and conditions of the Contract
[EuProgrRelated]:
[No]