Corrigendum

Information

Published

Date of dispatch of this notice: 15/08/2018

External Reference: 2018-227479

TED Reference: 2018/S 158-361343

Corrigendum

[NoticeCorrigendum]

[NoticeCorrigendumSub]

[Works]

[Section1]: [CaCe]

I.1)

[NameAddressContact]

National University of Ireland, Galway (NUI Galway)
N/A
University Road
Galway
IE
[Contactpoint]: Eithne O'Connell
[AddressPhone]: +353 91495664
[Nutscode]:  IE -  IRELAND
[Internets]:

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Works Contractor for Design and Build of NUI Galway Student Accommodation Phase 2 (with Novated Design Team)
[Fileref]:  NUIG/BUILD/036/2018
II.1.2)

[CpvMain]

45000000  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1st December 2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1st April to allow for adequate setup in advance of the summer letting season in May 2021.
A Single Point Design Team including PSDP has been appointed by NUI Galway (refer to prequalification information memorandum) and will be novated to the Works Contractor at Contract Award Stage.
The Works Contractor will be fully responsible for the completion of the novated design and the construction of the project. The form of contract for the project will be the Public

[Section6]: [InfoComplement]

VI.6)

[IcarOriginalRef]

[NumberOj]: 2018/S 130-295655

[Section7]: [Changes]

VII.1)

[IcarCorrectAdd]

VII.1.2)

[IcarTextCorrected]

[SectionNo]:  Info Memo-Section 11
[IcarInstead]:  
[Date]:  24/08/2018
[Time]:  12:00
[IcarRead]:  
[Date]:  03/09/2018
[Time]:  12:00
VII.2)

[IcarOtherInfo]

The prequalification response deadline has been extended. The response deadline is now 12 noon on Monday 3rd September 2018. All other submission details remain unchanged.