Contract notice

Information

Published

Date of dispatch of this notice: 27/07/2018

Expire date: 07/09/2018

External Reference: 2018-145374

TED Reference: 2018/S 145-330893

Contract notice

[NoticeContract]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Galway County Council
N/A
County Hall
Galway
Prospect Hill
IE
[Contactpoint]: Brendan Gallagher
[AddressPhone]: +353 91509002
[AddressEmail]: bgallagher@galwaycoco.ie
[Nutscode]:  IE -  IRELAND
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=133002&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AddressAnother]: 
Heather Gibbons
Galway National Roads Office
Ballybritt, Galway
H91 KT67
IE
[Contactpoint]: Heather Gibbons
[AddressPhone]: +353 91509000
[AddressEmail]: hmgibbons@galwaycoco.ie
[Nutscode]:  IE -  IRELAND
[Internets]:
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[MaintypeLocalauth]
I.5)

[Mainactivity]

[MainactivGeneral]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

N59 Maam Cross to Bunnakill
[Fileref]:  N59 Maam Cross to Bunnakill
II.1.2)

[CpvMain]

45233121  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

The proposed development consists of the realignment of a section of the existing N59 between Maam Cross and the townland of Bunnakill in County Galway. This section of road is approximately 5km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6m carriageway, 0.5m hard strips and verges of approximately 2m to 3m. Upgrades also include the improvement / realignment of a number of local and access roads.The Project includes earthworks in challenging ground conditions, excavation and replacement of substantial quantities of peat, including removal of peat underlying existing road and the construction of two peat restoration areas and five material deposition sites.There are a number of structures on the scheme possibly including two new bridges and two retaining walls.
The proposed scheme is located in an environmentally sensitive area and environmental mitigation measures will form a very important aspect of the scheme.
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 7500000.00  EUR
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

45000000  - 
45200000  - 
45220000  - 
45221100  - 
45221110  - 
45221111  - 
45230000  - 
45233000  - 
45233100  - 
45233120  - 
45233125  - 
45233127  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE0 -  IRELAND
[Nutscode]:  IE -  IRELAND
[MainsiteplaceWorksDelivery]:  
Co. Galway
II.2.4)

[DescrProcurement]

The proposed development consists of the realignment of a section of the existing N59 between Maam Cross and the townland of Bunnakill in County Galway.
This section of road is approximately 5km in length and involves the construction of a new Type 3 standard single carriageway consisting of a 6m carriageway, 0.5m hard strips and verges of approximately 2m to 3m. Upgrades also include the improvement / realignment of a number of local and access roads.
The Project includes earthworks in challenging ground conditions, excavation and replacement of substantial quantities of peat, including removal of peat underlying existing road and the construction of two peat restoration areas and five material deposition sites.
There are a number of structures on the scheme possibly including two new bridges and two retaining walls.
The proposed scheme is located in an environmentally sensitive area and environmental mitigation measures will form a very important aspect of the scheme.
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 7500000.00  EUR
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 14
[RenewalsSubject]: [No]
II.2.9)

[LimitOperators]

[EnvisagedNumber]: 5
[CriteriaChoosingLimited]:
All details are included in the documents uploaded
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [Yes]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2.14)

[InfoAdditional]

The construction of this 5km section of national road
in the connamara region will require careful
construction mitigation to meet the requirements laid
out in the environmental impact statement. The
project includes some bridge works with a
considerable amount of peat excavation.

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.2)

[ConditionsContract]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeRestricted]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.1)

[PubPrevious]

[NumberOj]: 2018/S 095-214673
IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  31/08/2018
[Time]:  17:00
IV.2.3)

[DateDispatchTenderParticipate]

[Date]: 05/10/2018
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 14  ([FromStatedDate])

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

N59 Maam Cross to Bunnakill
Galway
IE