Contract notice

Information

Published

Date of dispatch of this notice: 15/08/2018

Expire date: 24/08/2018

External Reference: 2018-527098

TED Reference: 2018/S 158-362234

Contract notice

[NoticeContract]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Design Pro Ltd.
IE 6400612O
Rathkeale Industrial Estate
Rathkeale
Co Limerick V94 ESC
IE
[Contactpoint]: Karolina Mazurek
[AddressPhone]: +353 6963842
[AddressEmail]: accounts@designpro.ie
[Nutscode]:  IE051 -  Mid-West
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=132336&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[OtherType]:  Private Company engaged in EU funded RD&D
I.5)

[Mainactivity]

[OtherActivity]:  Publicly funded RD&D

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Design and supply of a power take off converter and control system for a 60 kw hydro-kinetic turbine
[Fileref]:  DPR 60 PTO Controller
II.1.2)

[CpvMain]

31122000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

DesignPro is developing a hydro-kinetic turbine to generate electrical power from water flows. The turbine design deploys 2 hydrokinetic turbines connected to in-line gearboxes that drive standard 3 phase induction motors. Given the fluctuating power to be derived from variable water flows, the rotational speed of the turbines must be controlled to standardise the power output, which will need to be adapted to a standard acceptable for grid connection. Accordingly, the Company requires the design, supply and testing of an “AC to AC” power conversion unit together with a control system that is capable of managing the adaptation of the power output to grid acceptable standards.
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 40000.00  EUR
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

31122000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE051 -  Mid-West
[MainsiteplaceWorksDelivery]:  
Rathkeale, Co Limerick, Ireland
II.2.4)

[DescrProcurement]

DesignPro is developing a hydro-kinetic turbine to generate electrical power from water flows. The turbine design deploys 2 hydrokinetic turbines connected to in-line gearboxes that drive standard 3 phase induction motors. Given the fluctuating power to be derived from variable water flows, the rotational speed of the turbines must be controlled to standardise the power output, which will need to be adapted to a standard acceptable for grid connection. Accordingly, the Company requires the design, supply and testing of an “AC to AC” power conversion unit together with a control system that is capable of managing the adaptation of the power output to grid acceptable standards.
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 40000.00  EUR
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 12
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [Yes]
[EuProgrRef]: H2020 SME Instrument

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.1)

[SituationPersonalIncl]

[InfoEvaluatingRequir]:  Respondent must be able to demonstrate relevant history and expertise in respect of the proposed supply of electrical conversion and controller system
III.1.2)

[EconomicFinancialStanding]

[CriteriaSelectionDocs]
III.1.3)

[TechnicalCapacity]

[CriteriaSelectionDocs]
III.2)

[ConditionsContract]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [No]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  24/08/2018
[Time]:  18:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 12  ([FromStatedDate])
IV.2.7)

[OpeningConditions]

[Date]:  24/08/2018
[Time]:  18:00
[OpeningPlace]:  
Company Offices

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

Design Pro Ltd
Rathkeale Industrial Estate
Rathkeale
IE
[AddressPhone]: +353 6963842
[AddressEmail]: accounts@designpro.ie