Aran Islands Water Supply Upgrade
Reference number:
17/203
Inis Oirr: Site clearance to enable construction of the works; Provision of site compound and storage area for materials and equipment; Provision of 3 No. raw water tanks with a minimum total liquid volume of 9,470m3, completed with foundations and supports; Provision of scour and overflow pipelines; Provision of new tanks and hardstand drainage; Provision of 1 No. reverse osmosis water feed tank. Provision of chemical storage units complete with hard standing areas; Decommission of existing on-site raw water abstraction facility; Reinstatement and Landscaping works; All civil, mechanical and electrical works required under this Scope; All pipelines, valves, instrumentation required under this Scope; Provision of telemetry / control system to integrate with existing control and monitoring system; Design, supply, installation, construction, testing and commissioning of the works; services. Refer to ITT Document.