Provision of Employers Representatives Services as required for EirGrid Group.
EirGrid Interconnector Ltd (“EIL”) is the owner and operator of the 500MW HVDC
East West Interconnector (“EWIC”).
EWIC connects the Irish and UK transmission systems with the UK Point of
Connection located at Deeside 400kV Substation. The associated connection
agreement between EIL and National Grid includes for the Point of Connection to
be transferred to a new station Connah’s Quay in 2017.
The connection agreement places the responsibility on EIL to design, build and
commission all interface works associated with the new connection, including the
installation of a new section of HVDC cable and any necessary control and
protection equipment. During the associated outage (approx. 30-40 days) to
undertake the above works, EIL will use the opportunity to progress some or all of
the proposed IT & SCM system at the converter stations in Shotton and Portan.
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Resources
/
[Weighting]:
30%
[AwardCriterionQuality]
-
[AwardCriterionName]:
Approach & Methodology
/
[Weighting]:
20%
[AwardCriterionQuality]
-
[AwardCriterionName]:
Assessment of Resource Allocation Schedule
/
[Weighting]:
5%
[AwardCriterionQuality]
-
[AwardCriterionName]:
Legal
/
[Weighting]:
5%
[Price]
-
[Weighting]:
40%