Carlow County Council have identified a need for Columbarium Walls to inter cremated remains for members of the public. The Columbarium Walls are to be single sided with 48 niches per wall with two walls in total, with a total of 96 niches required. Each niche is to be capable of holding 2 standard sized cremation urns.
Works
29/06/2022 12:00:00
45215400-1 Cemetery works
44000000-0 Construction structures and materials; auxiliary products to construction (except electric apparatus)
44100000-1 Construction materials and associated items
44110000-4 Construction materials
44113120-2 Paving slabs
44900000-9 Stone for construction, limestone, gypsum and slate
44912100-7 Granite
45210000-2 Building construction work
Carlow County Council
Athy Road
Carlow R93 E7R7
Co Carlow
Ireland
[ViewProfile]
Tadhg Madden
http://www.carlow.ie
Notice | [DispatchDate] |
---|---|
Contract Notice (eTenders) | 30/05/2022 16:30 |
Contract Award Notice (eTenders) | 10/08/2022 09:34 |
O'Riordan Monumental Works Ltd, [OrgNo]: 9672931F