To provide an electrical rewire for LV power installations to the school’s accommodations to resolve the issues identified by the electrical contractor and subsequently reviewed and corroborated by Ipsum Engineers. The works necessary are strip out of the existing power and lighting wiring ccts and the installation of new main and sub dist boards throughout the school including the final run outs to socket and light fittings locations. On account of the current COVID situation and limitations for working in and around an occupied school, we would suggest that the rewire could be carried out over the summer holidays as it would be impractical to attempt to carry out these works during term time.
Works
21/07/2021 12:00:00
45000000-7 Construction work
71000000-8 Architectural, construction, engineering and inspection services
71300000-1 Engineering services
71500000-3 Construction-related services
80000000-4 Education and training services
St. Mary's National School (Castlefinn)
Castlefinn
Co.Donegal
Lifford
Ireland
[ViewProfile]
Daniel Mc Cready
Notice | [DispatchDate] |
---|---|
Contract Notice (eTenders) | 07/07/2021 16:30 |