Iarnród Éireann requires the services of a multi-disciplinary consultant to provide Detailed Design services (Phase 5) and subsequent technical support and construction management services (Phase 6 + 7), for the construction of a new EMU Depot to the west of Maynooth as part of the DART+ West Project.
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Methodology (i) Design Review and Detailed Design Development
/
[Weighting]:
7
[AwardCriterionQuality]
-
[AwardCriterionName]:
Methodology (ii) Programme
/
[Weighting]:
6
[AwardCriterionQuality]
-
[AwardCriterionName]:
Methodology (iii) Tender Process and Contract Award
/
[Weighting]:
4
[AwardCriterionQuality]
-
[AwardCriterionName]:
Methodology (iv) Construction (Technical Design Support)
/
[Weighting]:
6
[AwardCriterionQuality]
-
[AwardCriterionName]:
Methodology (v) Construction (Management)
/
[Weighting]:
6
[AwardCriterionQuality]
-
[AwardCriterionName]:
Methodology (vi) System Integration and Testing and Commissioning
/
[Weighting]:
6
[AwardCriterionQuality]
-
[AwardCriterionName]:
Proposed Project Team
/
[Weighting]:
10
[AwardCriterionQuality]
-
[AwardCriterionName]:
Safety Assurance
/
[Weighting]:
10
[AwardCriterionQuality]
-
[AwardCriterionName]:
Sustainability Management
/
[Weighting]:
5
[Price]
-
[Weighting]:
40