II.1)
Scope of the procurement
Multi Supplier Framework Agreement for the provision of Project Supervisor Design Process (PSDP) Consultancy Services
Reference number:
DHDA PSDP 1
71317210
-
Health and safety consultancy services
Services
II.1.4)
Short description
The Contracting Authority proposes to establish a Multi-Party Framework Agreement for 4 years from commencement with the Contracting Authority having the option of extending the agreement for further periods of two (2) years, and a further one (1) year, subject to the satisfactory performance of the tenderer.
Project Supervisor Design Process (PSDP) Consultancy services are anticipated to support works involving repairs and refurbishment of existing buildings, including protected structures. However, over the course of the Framework other projects may be required including new or replacement buildings and structures.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Value excluding VAT:
250000.00
EUR
II.2.2)
Additional CPV code(s)
71000000
-
Architectural, construction, engineering and inspection services
71300000
-
Engineering services
71318000
-
Advisory and consultative engineering services
71500000
-
Construction-related services
71530000
-
Construction consultancy services
II.2.3)
Place of performance
NUTS code:
IE061 -
Dublin
NUTS code:
IE06 -
Eastern and Midland
NUTS code:
IE0 -
IRELAND
NUTS code:
IE -
IRELAND
II.2.4)
Description of the procurement
The Contracting Authority proposes to establish a Multi-Party Framework Agreement for 4 years from commencement with the Contracting Authority having the option of extending the agreement for further periods of two (2) years, and a further one (1) year, subject to the satisfactory performance of the tenderer.
Project Supervisor Design Process (PSDP) Consultancy services are anticipated to support works involving repairs and refurbishment of existing buildings, including protected structures. However, over the course of the Framework other projects may be required including new or replacement buildings and structures.
Criteria below
Quality criterion
-
Name:
Service Methodology
/
Weighting:
30
Quality criterion
-
Name:
Quality & Relevancy of Resources
/
Weighting:
20
Cost criterion
-
Name:
Notional Cost
/
Weighting:
50
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no