Corrigendum

Information

Published

Date of dispatch of this notice: 29/06/2022

External Reference: 2022-269803

TED Reference: 2022/S 126-357698

Corrigendum

[NoticeCorrigendum]

[NoticeCorrigendumSub]

[Works]

[Directive201424]

[Section1]: [CaCe]

I.1)

[NameAddressContact]

Tipperary Energy Agency
280878
Erasmus Smith House
Cahir
Tipperary
IE
[Contactpoint]: TEA TEA
[AddressPhone]: +353 0527443090
[AddressEmail]: tenders@tea.ie
[AddressFax]: +353 0527443012
[Nutscode]:  IE -  IRELAND
[Internets]:

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Ballygiblin National School SWS 2022, Heating System Upgrade
[Fileref]:  201964
II.1.2)

[CpvMain]

45232141  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

The project consists of the decommissioning and removal of the existing oil boiler and associated single pipe distribution network, and the installation of a new LPG cascade boiler configuration, a new two pipe distribution network that is future proofed and capable of supporting the integration of renewable heating solutions such as heat pumps, and compliant to current DoE TGD’s. The mechanical contractor must include for all electrical attendances, civil and builders works, and making good after installation.

[Section6]: [InfoComplement]

VI.6)

[IcarOriginalRef]

[NumberOj]: 2022/S 116-323386

[Section7]: [Changes]

VII.1)

[IcarCorrectAdd]

VII.1.2)

[IcarTextCorrected]

[SectionNo]:  IV.2.2
[IcarTextCorrPlace]:  Time limit for receipt of tenders or requests to participate
[IcarInstead]:  
[Date]:  27/06/2022
[Time]:  13:00
[IcarRead]:  
[Date]:  01/07/2022
[Time]:  13:00
VII.2)

[IcarOtherInfo]

Extension of Return of Tender to 01.07.2022 @ 13:00