II.1)
Scope of the procurement
Upgrade of Lighting at Smithfield Square
45316100
-
Installation of outdoor illumination equipment
Works
II.1.4)
Short description
Dublin City Council is seeking a contractor to:
1. Supply, install and maintain a controllable LED colour changing lighting system for the feature lighting on the masts in Smithfield, replacing the existing CMD fittings.
2. Supply and install Public Realm Lighting scheme to deliver a EN13201 P1 Lighting Class with capabilities for dimming and future CMS integration capabilities. The specification for this scheme is detailed in the Works Requirements in Volume A. There is also a requirement to upgrade existing electrical infrastructure in required locations to support the installation of upgraded lighting scheme.
A minimum full warranty shall include removal of defective luminaires and supply & re-installation of replacement luminaires within the first 5 years with supply of replacement luminaire up to 8 years.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Value excluding VAT:
135275.00
EUR
II.2.2)
Additional CPV code(s)
31500000
-
Lighting equipment and electric lamps
31527260
-
Lighting systems
34928500
-
Street-lighting equipment
34928510
-
Street-lighting columns
45316100
-
Installation of outdoor illumination equipment
45316110
-
Installation of road lighting equipment
50232100
-
Street-lighting maintenance services
50232110
-
Commissioning of public lighting installations
II.2.3)
Place of performance
NUTS code:
IE061 -
Dublin
II.2.4)
Description of the procurement
Dublin City Council is seeking a contractor to:
1. Supply, install and maintain a controllable LED colour changing lighting system for the feature lighting on the masts in Smithfield, replacing the existing CMD fittings.
2. Supply and install Public Realm Lighting scheme to deliver a EN13201 P1 Lighting Class with capabilities for dimming and future CMS integration capabilities. The specification for this scheme is detailed in the Works Requirements in Volume A. There is also a requirement to upgrade existing electrical infrastructure in required locations to support the installation of upgraded lighting scheme.
A minimum full warranty shall include removal of defective luminaires and supply & re-installation of replacement luminaires within the first 5 years with supply of replacement luminaire up to 8 years.
Criteria below
Quality criterion
-
Name:
Fitness for purpose
/
Weighting:
30
Quality criterion
-
Name:
Methodology
/
Weighting:
30
Quality criterion
-
Name:
Health & Safety
/
Weighting:
10
Cost criterion
-
Name:
Ultimate Cost
/
Weighting:
30
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no