Newtown School – Post Primary School Redevelopment – Phase 1 (Main Contractor)
[Fileref]:
65010R
[Works]
Extension to the existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including passenger lift and Special Educational Needs Block (approx. 5,400m2), new single storey PE Facility building (approx. 1,150m2), new vehicular entrance, car parking, boundary wall realignment, new substation and construction store, together with associated landscaping and external works. All within the curtilage of two Protected Structures. The project will be completed and handed over on a phased basis. Reserved specialists shall be pre-selected for Mechanical and Electrical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 15500000.00
EUR
[DivisionLots]:
[No]
II.2.3)
[PlacePerformance]
[Nutscode]:
IE05 -
Southern
[Nutscode]:
IE0 -
IRELAND
[Nutscode]:
IE -
IRELAND
[MainsiteplaceWorksDelivery]:
Newtown School, Newtown Road, Waterford
II.2.4)
[DescrProcurement]
Extension to the existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including passenger lift and Special Educational Needs Block (approx. 5,400m2), new single storey PE Facility building (approx. 1,150m2), new vehicular entrance, car parking, boundary wall realignment, new substation and construction store, together with associated landscaping and external works. All within the curtilage of two Protected Structures. The project will be completed and handed over on a phased basis.
Reserved specialists shall be pre-selected for Mechanical and Electrical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract.
Mechanical and Electrical reserved specialists’ role shall consist of the installation, testing and commissioning of all mechanical installations including sub-specialists works associated with the works.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 15500000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
28
[RenewalsSubject]:
[No]
[EnvisagedNumber]:
8
[CriteriaChoosingLimited]:
Suitability Assessment Questionnaire
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Reserved specialists shall be pre-selected for Mechanical and Electrical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract. Reserved Specialists will be required to execute a Collateral Warranty with the Employer.