Corrigendum

Information

Published

Date of dispatch of this notice: 20/05/2022

External Reference: 2022-282211

TED Reference: 2022/S 101-278830

Corrigendum

[NoticeCorrigendum]

[NoticeCorrigendumSub]

[Works]

[Directive201424]

[Section1]: [CaCe]

I.1)

[NameAddressContact]

Donegal County Council
N/A
County House
Co Donegal
Lifford
IE
[Contactpoint]: Cathal Moss
[AddressPhone]: +353 749153900
[AddressEmail]: cmoss@donegalcoco.ie
[Nutscode]:  IE041 -  Border
[Internets]:

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Greencastle Breakwater
II.1.2)

[CpvMain]

45244000  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

Donegal County Council is undertaking a joint pre-qualification and tender process to identify a contractor to undertake the construction of the Greencastle Breakwater works.
The following works are included.
• Alterations to the existing breakwater
• Construction of approximately 130m of new breakwater
• Construction of reinforced concrete walkway and wave wall along the length of the entire breakwater
• Installation of ducting, chambers, and lighting

[Section6]: [InfoComplement]

VI.6)

[IcarOriginalRef]

[NumberOj]: 2022/S 081-216980

[Section7]: [Changes]

VII.1)

[IcarCorrectAdd]

VII.1.2)

[IcarTextCorrected]

[SectionNo]:  IV.2.2
[IcarInstead]:  
[Date]:  30/05/2022
[Time]:  15:00
[IcarRead]:  
[Date]:  13/06/2022
[Time]:  15:00
VII.2)

[IcarOtherInfo]

Two week extension of time granted.