II.1)
Scope of the procurement
Provision of Technical, Economic and Financial Support in relation to the Certification of High Efficiency Combined Heat and Power Plants
Reference number:
011-03-476
71621000
-
Technical analysis or consultancy services
Services
II.1.4)
Short description
The HE CHP certification process is designed to assess whether heat and electricity from a CHP plant meets the high efficiency criteria set out in EU and Irish legislation. HE CHP certification is defined on the basis of a demonstrable demand for 'useful heat' and the Primary Energy Savings (PES) achieved versus alternative non-CHP solutions. If the overall efficiency exceeds a defined level of:
• 80% for “Combined cycle gas turbines with heat recovery” and “Steam condensing extraction turbines-based plants”; or
• 75% for other technologies.
then all the electricity from the plant is taken into account in the PES calculation
II.1.5)
Estimated total value
Value excluding VAT: 420000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
71600000
-
Technical testing, analysis and consultancy services
71631000
-
Technical inspection services
72220000
-
Systems and technical consultancy services
II.2.3)
Place of performance
II.2.4)
Description of the procurement
The Commission for Regulation of Utilities (“CRU”) is Ireland’s independent energy and water regulator. The CRU was originally established as the Commission for Energy Regulation (“CER”) in 1999. The CRU’s mission is to protect the public interest in Water, Energy and Energy Safety. The work of the CRU impacts every Irish home and business. The sectors we regulate underpin Irish economic competitiveness, investment and growth, while also contribute to our international obligations to address climate change.
The CRU is committed to playing its role to help deliver a secure, low carbon future at the least possible cost, while ensuring energy is supplied safely, empowered and protected customers pay reasonable prices and we deliver a sustainable, reliable and efficient future for energy and water.
The Commission for Regulation of Utilities (CRU) is the appointed body to certify high-efficiency CHP (HE CHP) as set out in SI 298, 299 and 499 of 2009. The process of applying for certification is covered by CRU documents CER/12/125, CER/12/184 and CER/16/153. The certification process is designed to ensure that the plant meets the high efficiency criteria as set out in legislation.
The HE CHP certification process is designed to assess whether heat and electricity from a CHP plant meets the high efficiency criteria set out in EU and Irish legislation. HE CHP certification is defined on the basis of a demonstrable demand for 'useful heat' and the Primary Energy Savings (PES) achieved versus alternative non-CHP solutions. If the overall efficiency exceeds a defined level of:
• 80% for “Combined cycle gas turbines with heat recovery” and “Steam condensing extraction turbines-based plants”; or
• 75% for other technologies.
then all the electricity from the plant is taken into account in the PES calculation
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 420000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
24
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
yes
Description of options:
The contract will be awarded for a term of twenty-four (24) months with the option to extend for a further twelve (12) month period with a maximum of two (2) such extensions.
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
Please consult the associated documentation which contains full instructions regarding this submission of tenders and is available to download on www.etenders.gov.ie using RFT ID 209941.