II.1)
Scope of the procurement
Port Design, Planning and Foreshore Consenting Consultancy
71311000
-
Civil engineering consultancy services
Services
II.1.4)
Short description
Multi-disciplinary Consultant to progress the development a new Deepwater terminal at Foynes Port through the design, planning and foreshore consenting process
II.1.5)
Estimated total value
Value excluding VAT: 4000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
71311300
-
Infrastructure works consultancy services
71312000
-
Structural engineering consultancy services
71313000
-
Environmental engineering consultancy services
71322000
-
Engineering design services for the construction of civil engineering works
71530000
-
Construction consultancy services
II.2.3)
Place of performance
Main site or place of performance:
Shannon Estuary Ireland
II.2.4)
Description of the procurement
Multi-disciplinary Consultant to progress the development a new Deepwater terminal at Foynes Port through the design, planning and foreshore consenting process
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 4000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
48
This contract is subject to renewal:
yes
Description of renewals:
As per the tender documents
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged minimum number:
2
/
Maximum number:
4
Objective criteria for choosing the limited number of candidates:
As per the tender documents
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
yes
Identification of the project:
Pending - Grant agreement under the Connecting Europe Facility (CEF) - Transport sector.
"Feasibility of the development of a new deep-water berth at Foynes Island"