A94 X099.
A development to construct an extension to the existing NIBRT facility on a site of c.1.4892 ha at Belfield, Foster's Ave, Blackrock, Eircode A94 X099. The development will consist of: the removal of the existing foundations and access ramp associated with a previously located prefabricated building; and the construction of a two storey extension to the existing Research and Training facility building to provide an additional 1,500 sq m of laboratory floorspace and ancillary facilities. The resulting total gross floor area of the building will be 7,985 sq m. The development will also consist of: alterations to the elevations, roof and internal layouts of the existing building; hard and soft landscaping (including the removal of the existing berm); surface car parking, including re-configurations to the existing car park and new car parking spaces to provide an additional 58 No. spaces, resulting in an overall total of 80 No. car parking spaces (including 4 No. wheelchair accessible spaces) and associated ductwork for EV charging to all spaces; 2 no. bicycle parking shelters (total of 81.1 sq m); additional showering facilities within the existing building, an additional servicing and delivery bay; plant and services (mechanical and electrical, water supply, sewage disposal and surface water disposal) and; all other site development works above and below ground.
DLRCC Planning reference D20A/0794
https://planning.agileapplications.ie/dunlaoghaire/search-applications/results?criteria=%7B%22query%22:%22d20a%2F0794%22%7D&page=1
The main contract works comprise the complete development including inter alia all civil infrastructure and external works, structural, architectural, exterior precast concrete paneling, mechanical, HVAC and building services, piping, process gases, electrical, instrumentation and controls, fire protection, security, asbestos contaminated groundworks removal, partial furniture fitout of laboratory and training spaces, landscaping.
[MaxNumber]:
8
[CriteriaChoosingLimited]:
Maximum of 8 applicants will be short-listed subject to a satisfactory level of response and subject to all shortlisted candidates meeting the minimum standards and qualifications required.
Estimated total cost of construction EUR 14 M. Set out below are the approximate estimated proportions of total cost of construction for each of the stated specialist construction elements:
HVAC and Building Services 16%
Fire Protection 1%
Electrical 8%
Piping 7%
Interior Fitout of Laoratories and Training spaces 9%