Contract notice - utilities

Information

Published

Date of dispatch of this notice: 31/05/2021

Expire date: 02/07/2021

External Reference: 2021-294516

TED Reference: 2021/S 107-282776

Contract notice - utilities

[NoticeContractUtilities]

[Works]

[Directive201425]

[Section1]: [Ce]

I.1)

[NameAddressContact]

Iarnród Eireann-Irish Rail
IE 4812851 O
Connolly Station,
Dublin
Dublin
IE
[Contactpoint]: Noel Coss
[AddressPhone]: +353 17031775
[AddressEmail]: Noel.Coss@irishrail.ie
[Nutscode]:  IE -  IRELAND
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=190196&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.6)

[Mainactivity]

[MainactivRailway]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Track Stabilisation (mini-piling) Lisduff
[Fileref]:  7765
II.1.2)

[CpvMain]

45234100  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

Iarnród Éireann (IÉ) has a requirement for a Civil/Structural Engineering contractor to carry out piling works along a section of track on the Dublin-Cork line. The location of the site is between 71mls 1735yds and 72mls 1560yds at Lisduff, Co. Tipperary This section of track is double line which serves passenger services between Dublin (Heuston Station) and Cork (Kent Station). The traffic along the section has a max speed of 90MPH.
The track bed has a soft peat formation which has resulted in problems with both vertical and horizontal track alignment. As a result of the poor track bed formation, a permanent 80mph speed restriction has been imposed on this stretch of 100mph line. Frequent tamping intervention is also required at this location to ensure that the track bed remains stable.
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 4000000.00  EUR
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

45220000  - 
45234100  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE -  IRELAND
II.2.4)

[DescrProcurement]

Iarnród Éireann (IÉ) has a requirement for a Civil/Structural Engineering contractor to carry out piling works along a section of track on the Dublin-Cork line. The location of the site is between 71mls 1735yds and 72mls 1560yds at Lisduff, Co. Tipperary This section of track is double line which serves passenger services between Dublin (Heuston Station) and Cork (Kent Station). The traffic along the section has a max speed of 90MPH.
The track bed has a soft peat formation which has resulted in problems with both vertical and horizontal track alignment. As a result of the poor track bed formation, a permanent 80mph speed restriction has been imposed on this stretch of 100mph line. Frequent tamping intervention is also required at this location to ensure that the track bed remains stable.
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 4000000.00  EUR
II.2.7)

[DurationContractFrameworkDps]

[Starting]: 07/10/2021  /  [End]: 17/06/2022
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.1)

[SituationPersonalIncl]

[InfoEvaluatingRequir]:  For full details, please download a copy of the attached Pre-Qualification Questionnaire.
III.1.2)

[EconomicFinancialStanding]

[InfoEvaluatingWethRequir]:  
The economic and financial capacity of the entity must be established to the satisfaction of IE.
Applicants will be invited to complete a questionnaire (attached) which seeks company details; information on similar contracts undertaken with value, dates, locations and contact names for reference etc; applicants may be requested to provide supporting information such as balance sheets for the past three financial years.
For full details, please download a copy of the attached Pre-Qualification Questionnaire.
III.1.3)

[TechnicalCapacity]

[InfoEvaluatingWethRequir]:  
The technical competence of the entity, its employees and processes must be established to the satisfaction of IE. Applicants will be invited to complete a questionnaire which seeks company details to establish the entity’s technical capacity.
For full details, please download a copy of the attached Pre-Qualification Questionnaire.
III.2)

[ConditionsContract]

III.2.2)

[OtherConditions]

For full details, please download a copy of the attached Pre-Qualification Questionnaire.

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeNegotWCall]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  02/07/2021
[Time]:  12:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

Central Office of the High Court
Four Courts
Dublin 7
D07 N972
IE
[AddressPhone]: +353 18886511
[AddressFax]: +353 18886125

VI.4.2)

[MediationBody]

High Court
Dublin
IE

VI.4.4)

[AppealsInfo]

Central Office of the High Court
Four Courts
Dublin 7
D07 N972
IE
[AddressPhone]: +353 18886511
[AddressFax]: +353 18886125