II.1)
[QuantityScopeContract]
Framework B 2020 Agreement - for Engineering Consultancy Led Design Team Services for the Provision of Road Projects
[Fileref]:
CC_RLRDO_R_34_2020
[Services]
Cork County Council (CCC) is procuring to establish a Framework of Companies to provide Engineering Consultancy (Road Design) led services to assist CCC Engineers with the planning, design & construction services required to upgrade existing roads and deliver new road schemes (on both the urban and rural road network). The Framework Agreement that may result from this competition will be for a term of 2 years. The Contracting Authority (CA) reserves the right, at its discretion, to extend the Term for a period, or periods, of up to 24 months on the same terms and conditions. The Term will not exceed 4 years in aggregate.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 2400000.00
EUR
[DivisionLots]:
[Yes]
[LotsSubmittedFor]
[LotsAll]
II.2.4)
[DescrProcurement]
Lot 1
Projects with an estimated construction stage cost
€0.5m - < €5m
Maximum no. Framework Members
10
The CA decision to use Lot 1 Framework for Stage 2 Call-Off Services will be based on the following:
Road Planning, Design & Construction Administration Projects (upgrade or new road construction projects) with a construction value estimate of <€5m
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Criteria A
/
[Weighting]:
15
[AwardCriterionQuality]
-
[AwardCriterionName]:
Criteria B
/
[Weighting]:
15
[AwardCriterionQuality]
-
[AwardCriterionName]:
Criteria C
/
[Weighting]:
15
[AwardCriterionQuality]
-
[AwardCriterionName]:
Criteria D
/
[Weighting]:
15
[AwardLowestCost]
-
[AwardCriterionName]:
Price
/
[Weighting]:
40
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 800000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
24
[RenewalsSubject]:
[Yes]
[RenewalsDescr]:
The Contracting Authority (CA) reserves the right, at its discretion, to extend the Term for a period, or periods, of up to 24 months on the same terms and conditions. The Term will not exceed 4 years in aggregate.
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.4)
[DescrProcurement]
Lot 2
Projects with an estimated construction stage cost
= or > €5m (*)
(*) Additional selection criteria for Lot 2 Framework are listed in Appendix 1.1 to the cover letter and The FID Document Section 2.
Maximum no. Framework Members
10
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Criteria A
/
[Weighting]:
20
[AwardCriterionQuality]
-
[AwardCriterionName]:
Criteria B
/
[Weighting]:
20
[AwardCriterionQuality]
-
[AwardCriterionName]:
Criteria C
/
[Weighting]:
20
[AwardCriterionQuality]
-
[AwardCriterionName]:
Criteria D
/
[Weighting]:
10
[AwardLowestCost]
-
[AwardCriterionName]:
Price
/
[Weighting]:
30
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 1200000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
24
[RenewalsSubject]:
[Yes]
[RenewalsDescr]:
The Contracting Authority (CA) reserves the right, at its discretion, to extend the Term for a period, or periods, of up to 24 months on the same terms and conditions. The Term will not exceed 4 years in aggregate.
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]