II.1)
Scope of the procurement
DART expansion Multi-disciplinary Consultancy team Maynooth line and City Centre enhancements
Reference number:
7240
71311300
-
Infrastructure works consultancy services
Services
II.1.4)
Short description
Iarnród Éireann - Irish Rail "IE" has a requirement for a Multi-disciplinary Consultancy team to support IE in the proposed expansion of the Dublin area Rapid transit network "DART".
This requirement is for a team to support the proposed expansion of the Maynooth line and City Centre enhancements including but not limited to:
• Preparation of the designs
• Undertake the environmental impact assessment
• Manage the Railway order process
• Tender preparation and evaluation
• With an option for design support during construction stage
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
71200000
-
Architectural and related services
71311000
-
Civil engineering consultancy services
71311200
-
Transport systems consultancy services
71312000
-
Structural engineering consultancy services
71313000
-
Environmental engineering consultancy services
71313100
-
Noise-control consultancy services
71314300
-
Energy-efficiency consultancy services
71315200
-
Building consultancy services
71315210
-
Building services consultancy services
71316000
-
Telecommunication consultancy services
71351200
-
Geological and geophysical consultancy services
71530000
-
Construction consultancy services
72224000
-
Project management consultancy services
79415200
-
Design consultancy services
79416200
-
Public relations consultancy services
79417000
-
Safety consultancy services
79418000
-
Procurement consultancy services
II.2.3)
Place of performance
Main site or place of performance:
Dublin
II.2.4)
Description of the procurement
Iarnród Éireann - Irish Rail "IE" has a requirement for a Multi-disciplinary Consultancy team to support IE in the proposed expansion of the Dublin area Rapid transit network "DART".
This requirement is for a team to support the proposed expansion of the Maynooth line and City Centre enhancements including but not limited to:
• Preparation of the designs
• Undertake the environmental impact assessment
• Manage the Railway order process
• Tender preparation and evaluation
• With an option for design support during construction stage
II.2.5)
Award criteria
( Agree to publish? yes )
Criteria below
Quality criterion
-
Name:
Proposed project team
/
Weighting:
14
Quality criterion
-
Name:
Proposed methodologies for undertaking design development process etc.
/
Weighting:
12
Quality criterion
-
Name:
Proposed methodology for management of Railway order process
/
Weighting:
13
Quality criterion
-
Name:
Proposed methodology for cost management
/
Weighting:
2
Quality criterion
-
Name:
Identification of critical issues in forming a procurement strategy
/
Weighting:
2
Quality criterion
-
Name:
Proposed MDC delivery program
/
Weighting:
2
Quality criterion
-
Name:
Proposed MDC Corporate governance systems
/
Weighting:
2
Quality criterion
-
Name:
Proposed methodology for design support
/
Weighting:
3
Cost criterion
-
Name:
Cost
/
Weighting:
50
II.2.11)
Information about options
Options:
yes
Description of options:
This is a contract for 24 months with an option to extend during the Construction phase for 36 months or until Construction is completed.
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no