II.1)
Scope of the procurement
Supply & Support Agreement for MPLS-TP Equipment and Associated Design & Support
Reference number:
7238
32412100
-
Telecommunications network
Supplies
II.1.4)
Short description
Iarnród Éireann currently operates a legacy transmission network using now obsolete Ericsson Synchronous Digital Hierarchy (SDH) technology and Nokia Plesiochronous Digital Hierarchy (PDH) technology. The transmission equipment runs over 2,000km of optical fibre network with copper links to many end-point locations. This SDH/PDH network, which primarily carries operational traffic (i.e. Signalling Control, Safety Critical Voice Communications, Level Crossing Control & Video Images, OCS Control Systems) is facing obsolescence in the near term and IE is therefore planning for:
• The replacement of the current SDH/PDH network with modern, future-proof and fit-for-purpose transmission network equipment;
• The seamless and efficient transition and migration of services from the current SDH/PDH network to the new replacement network.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
32260000
-
Data-transmission equipment
32270000
-
Digital transmission apparatus
32424000
-
Network infrastructure
32500000
-
Telecommunications equipment and supplies
32522000
-
Telecommunications equipment
32524000
-
Telecommunications system
72318000
-
Data transmission services
II.2.4)
Description of the procurement
Iarnród Éireann currently operates a legacy transmission network using now obsolete Ericsson Synchronous Digital Hierarchy (SDH) technology and Nokia Plesiochronous Digital Hierarchy (PDH) technology. The transmission equipment runs over 2,000km of optical fibre network with copper links to many end-point locations. This SDH/PDH network, which primarily carries operational traffic (i.e. Signalling Control, Safety Critical Voice Communications, Level Crossing Control & Video Images, OCS Control Systems) is facing obsolescence in the near term and IE is therefore planning for:
• The replacement of the current SDH/PDH network with modern, future-proof and fit-for-purpose transmission network equipment;
• The seamless and efficient transition and migration of services from the current SDH/PDH network to the new replacement network.
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
72
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
Full details enclosed in the Pre-Qualification Questionnaire available from htpp://www.etenders.ie