II.1)
Scope of the procurement
Works Contractor for Design and Build of NUI Galway Student Accommodation Phase 2 (with Novated Design Team)
Reference number:
NUIG/BUILD/036/2018
45000000
-
Construction work
Works
II.1.4)
Short description
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 471 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1st December 2020 to allow for adequate setup in advance of the start of the second semester in January 2021. The second phase will be required for immediate fitout on the 1st April to allow for adequate setup in advance of the summer letting season in May 2021.
A Single Point Design Team including PSDP has been appointed by NUI Galway (refer to prequalification information memorandum) and will be novated to the Works Contractor at Contract Award Stage.
The Works Contractor will be fully responsible for the completion of the novated design and the construction of the project. The form of contract for the project will be the Public