Date of dispatch of this notice: 20/03/2015
Expire date: 27/04/2015
External Reference: 2015-347898
TED Reference: 2015/S 059-104031
Date of dispatch of this notice: 20/03/2015
Expire date: 27/04/2015
External Reference: 2015-347898
TED Reference: 2015/S 059-104031
Thermal Energy Efficiency Project
Longford
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33% by 2020.
To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project directly from the energy savings generated as a direct result of the project.
To develop an energy performance contract that will provide the necessary funding to finance the project from the energy savings generated as a direct result of the project.
The EPC contractor responsible for the primary gas energy use by the boilers as a means of M & T for the project.
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33% by 2020.
To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project directly from the energy savings generated as a direct result of the project.
To develop an energy performance contract that will provide the necessary funding to finance the project from the energy savings generated as a direct result of the project.
The EPC contractor responsible for the primary gas energy use by the boilers as a means of M & T for the project.
As per PQQ Prequalification Questionnaire & PIM Project Information Memorandum
As per PQQ Prequalification Questionnaire & PIM Project Information Memorandum
As per PQQ Prequalification Questionnaire & PIM Project Information Memorandum
As per PQQ Prequalification Questionnaire & PIM Project Information Memorandum
As per PQQ Prequalification Questionnaire & PIM Project Information Memorandum
As per PQQ Prequalification Questionnaire & PIM Project Information Memorandum
As per PQQ Prequalification Questionnaire & PIM Project Information Memorandum
FD02/05/321