Establishment of a Single-Party Framework Agreement for ICT Infrastructure and Platform Upgrade and Refresh
Dublin
PRTB invites expressions of interest for the provision ICT Infrastructure and Platform Upgrade and Refresh including compute, storage and network elements together with related Support Services. All services must take place whilst maintaining a fully operational and functional production environment continuing to provide the full range of existing ICT services to PRTB‘s user and client base.
The scope of the requirements includes the following elements requiring work at both locations:
1. Increased / new processing capacity – provision, installation and commissioning of processors
2. Increased / new storage – provision, installation and commissioning of (tiered) storage
3. Increased / new bandwidth connectivity within data centres and to the external world – provision, installation and commissioning of new /additional network elements both within data centres and to the external world
4. The physical migration of the existing hardware at the collocated facility to the in-house facility and the re-establishment of an integrated and fully functioning data centre within the in-house facility using this equipment and ancillary software
5. The retirement of the hardware at the in-house facility (and secure disposal of same)
6. The migration of systems currently run on the in-house facility to the collocated facility
7. The migration of systems currently run in the collocated facility to the in-house facility
8. The provision of production, pre-production, test and development environments
9. The design, implementation, commissioning and testing of DR capability between the two locations
10. The management and provision where necessary of the necessary licencing arrangements
11. Project management of the complete project including taking ownership of the liaison requirements with existing partners including collocated facility provider, ISP, Application Vendors, licensees, UAT, the cut over of hardware and the cutover of software between data centres, etc.
12. Provision of post project management and support services
All of the above has to take place whilst maintaining a fully operational and functional production environment continuing to provide the full range of existing ICT services to PRTB’s user and client base.
To be agreed with the successful service provider.
A grouping if successful must be prepared to contract as a single entity having joint and several liability.
Please refer to the qualification questionnaire available to download from www.etenders.gov.ie
Please refer to the qualification questionnaire available to download from www.etenders.gov.ie
Please refer to the qualification questionnaire available to download from www.etenders.gov.ie
1. Please note that responses to the questionnaire available from www.etenders.gov.ie must be submitted back via the etenders platform only. Suppliers must therefore register and download the documents from etenders only to enable them to respond via the system.
2. The Contracting Authority will not be responsible for any costs, charges or expenses incurred by candidates or tenderers in response to this competition.
3. Establishment of the framework agreement and award of any contracts will be subject to the approval of the competent authorities.
4. If for any reason it is not possible to conclude the framework agreement with the successful framework operator designate emerging from this competitive process, or if having concluded the framework agreement the Contracting Authority decides to terminate that agreement, the Contracting Authority reserves the right to admit the next highest scoring tenderer to the framework agreement on the basis of the same terms and conditions and as tendered by that latter party, at any time during the tender validity period.
5. At its absolute discretion, the contracting authority may elect to terminate this procurement process or the concluded framework at any time.
Please refer to the relevant Irish Statutory Instruments (SI 130 of 2010 and SI 420 of 2010) available at www.irishstatutebook.ie