Building Services (M&E) Engineering Services for additional accommodation at CBS New Ross comprising: • 3 additional General Classrooms 175.8 m2 • 1 General Classroom to replace existing prefab 58.6 m2 • 1 DCG Room 88.6 m2 • 1 Home Economics Room 118.6 m2 • Special Education Tuition Room m2 • Student & Staff Toilets 38 m2 • Locker space 50.4 m2 Giving Gross Floor Area including circulation and partitions: 701.4 m2.
Services
18/11/2019 17:00:00
71321000-4 Engineering design services for mechanical and electrical installations for buildings
71300000-1 Engineering services
71314310-8 Heating engineering services for buildings
71318000-0 Advisory and consultative engineering services
71333000-1 Mechanical engineering services
71334000-8 Mechanical and electrical engineering services
CBS Secondary School (New Ross)
Co.Wexford
New Ross
Ireland
View profile
Pat Rossiter
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 17/10/2019 01:10 |