CBS New Ross - Building Services (M&E) Engineering Services for additional accommodation at CBS New Ross

Building Services (M&E) Engineering Services for additional accommodation at CBS New Ross comprising: • 3 additional General Classrooms 175.8 m2 • 1 General Classroom to replace existing prefab 58.6 m2 • 1 DCG Room 88.6 m2 • 1 Home Economics Room 118.6 m2 • Special Education Tuition Room m2 • Student & Staff Toilets 38 m2 • Locker space 50.4 m2 Giving Gross Floor Area including circulation and partitions: 701.4 m2.

Services

18/11/2019 17:00:00

71321000-4  Engineering design services for mechanical and electrical installations for buildings
71300000-1  Engineering services
71314310-8  Heating engineering services for buildings
71318000-0  Advisory and consultative engineering services
71333000-1  Mechanical engineering services
71334000-8  Mechanical and electrical engineering services


CBS Secondary School (New Ross)
Co.Wexford
New Ross
Ireland
View profile

Pat Rossiter

Published notices
Contract notice (TED (v209)) 17/10/2019 01:10
Lots
Building Services (M&E) Engineering Services for additional accommodation at CBS New Ross
Additional information:
Documents Documents
Close