II.1)
Scope of the procurement
Single Party Framework for the Supply of Audio-Visual Equipment, Installation, Support and Maintenance
Reference number:
2023AV
32321200
-
Audio-visual equipment
Supplies
II.1.4)
Short description
The framework agreement will be established on foot of a competition for an initial contract in two phases. Both phases can run concurrently. Phase one relates to equipment to support video and audio presentations from a fixed lectern position in a formal presentation style arrangement. The timeframe for this phase is 3 months ideally occurring between June and August 2023
Phase two will comprise of a video conferencing system to enable web-based hybrid style meetings with remote attendees and content streaming & recording. The timeframe for this separate phase is also 3 months and may run in parallel with the first phase.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Value excluding VAT:
700000.00
EUR
II.2.2)
Additional CPV code(s)
32232000
-
Video-conferencing equipment
32321300
-
Audio-visual materials
32323300
-
Video equipment
32351300
-
Audio equipment accessories
50340000
-
Repair and maintenance services of audio-visual and optical equipment
50342000
-
Repair and maintenance services of audio equipment
II.2.3)
Place of performance
NUTS code:
IE061 -
Dublin
Main site or place of performance:
Dublin Ireland.
II.2.4)
Description of the procurement
The framework agreement will be established on foot of a competition for an initial contract in two phases. Both phases can run concurrently. Phase one relates to equipment to support video and audio presentations from a fixed lectern position in a formal presentation style arrangement. The timeframe for this phase is 3 months ideally occurring between June and August 2023
Phase two will comprise of a video conferencing system to enable web-based hybrid style meetings with remote attendees and content streaming & recording. The timeframe for this separate phase is also 3 months and may run in parallel with the first phase.
The initial contract will be awarded to the successful tenderer shortly after the formal establishment of the framework agreement. The Department building is a listed mid-eighteenth-century townhouse built by George Paul Monck. The Atrium, situated to the rear of the building, is a modern addition with a glass roof covering the old courtyard area. The Atrium is enclosed on three sides by the listed building and to the rear by a modern extension. Sensitivity to the listed nature of the building will be required. While the initial contract covers a specific location, the framework will be available for use throughout the Department. For the avoidance of doubt, the Contracting Authority confirms that the period of any contracts awarded under the framework agreement may extend beyond the date of expiry of the agreement. It is envisaged that the contracts relating to support and maintenance may be awarded for a maximum period of 8 years.
Criteria below
Quality criterion
-
Name:
Criterion B Resourcing of the Project Quality of Expertise of Proposed Team
/
Weighting:
20%
Quality criterion
-
Name:
Criterion C Degree of Conformance with the Technical Specification
/
Weighting:
25%
Quality criterion
-
Name:
Criterion D Proposed Methodology and Potential Risks to the Successful Delivery of the Project
/
Weighting:
20%
Quality criterion
-
Name:
Criterion E Contract Management Proposal
/
Weighting:
5%
Price
-
Weighting:
30%
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no