71313400
-
Environmental impact assessment for construction
71313430
-
Environmental indicators analysis for construction
71313440
-
Environmental Impact Assessment (EIA) services for construction
71313450
-
Environmental monitoring for construction
90710000
-
Environmental management
90711000
-
Environmental impact assessment other than for construction
90711300
-
Environmental indicators analysis other than for construction
90711400
-
Environmental Impact Assessment (EIA) services other than for construction
90711500
-
Environmental monitoring other than for construction
90712000
-
Environmental planning
90712400
-
Natural resources management or conservation strategy planning services
90713000
-
Environmental issues consultancy services
90714000
-
Environmental auditing
90714200
-
Corporate environmental auditing services
90714300
-
Sectoral environmental auditing services
90714400
-
Activity specific environmental auditing services
90720000
-
Environmental protection
The Office of Public Works (OPW), Arterial Drainage Maintenance Service is commissioning an environmental consultant to assist with various environmental services, to support arterial drainage maintenance activities on twenty six arterial drainage schemes.
Part 1
The principal study area for Part 1 of the Commission makes up twenty six schemes for arterial drainage schemes and flood relief schemes.
The contract will require the completion of AA Screening for 26 Schemes and it is assumed that 21 of these schemes will require an NIS. Reporting is to be completed over the next 3 year period. The AA Screening Reports and NIS for the twenty six schemes will be carried out in assigned years as follows:
Year 1 (2023): Abbey, Bonet, Boyle, Broadmeadow & Ward, Brosna, Donegal Schemes, Feale, Knockrockery, Lower Shannon Schemes, Maine, Hazelhatch, Matt.
Year 2 (2024):Ballyteigue/Kilimor, Corrib, Duff, Inny, KIlcoo, Killimor/Cappagh, Ouvane, Monaghan Blackwater.
Year 3 (2025):Boyne, Duleek, Mornington, Moy, Ryewater, Owenavorragh.
Completion of the AA Screening and NIS's for each year includes assessing the impact of the work and providing field data as described in Part 2 below.
Part 2
The OPW have identified lengths of channel that a Rapid River Corridor Survey should be completed. The lengths of channels identified are the channels within and 100m upstream and downstream of the boundary of the European Sites for which AA Screening and NIS is programmed for in that year. The Rapid River Corridor Survey includes approximately 1660km of channel to be carried out over a three year period.
Part 3
Further to the above the consultant may be asked to carry out further surveys within the 3 year period.
Further details will be provided in the tender documents which will be issued with the Request for Tender in due course