II.1)
Scope of the procurement
Biomass - St. Anne’s Primary School, Kilcarrig Ave, Fettercairn, Dublin 24
Reference number:
St Anne's - Pathfinder Project
45331110
-
Boiler installation work
Works
II.1.4)
Short description
Full upgrade of the existing heating system with the integration of a new biomass unit 215KW. The supplier shall allow for the delivery and manufacture of plant. The supplier shall a prefabricated containerised biomass wood pellet boiler installation in compliance with Architects drawings & specification and M&E drawings and specification. Connection into the existing LTHW heating system installation. Biomass boiler will act as primary boiler with natural gas boiler installation as assist and backup in event of failure/downtime of biomass boiler (including all necessary control configuration) Supply and sale of heat/fuel to school for set contract period in the form of wood pellet fuel and operation of the heating biomass boiler for 15 years
II.1.5)
Estimated total value
Value excluding VAT: 170000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45232141
-
Heating works
45331000
-
Heating, ventilation and air-conditioning installation work
45350000
-
Mechanical installations
45351000
-
Mechanical engineering installation works
51100000
-
Installation services of electrical and mechanical equipment
71314310
-
Heating engineering services for buildings
71321000
-
Engineering design services for mechanical and electrical installations for buildings
71321200
-
Heating-system design services
71333000
-
Mechanical engineering services
II.2.3)
Place of performance
Main site or place of performance:
Dublin
II.2.4)
Description of the procurement
Full upgrade of the existing heating system with the integration of a new biomass unit 215KW. The supplier shall allow for the delivery and manufacture of plant. The supplier shall a prefabricated containerised biomass wood pellet boiler installation in compliance with Architects drawings & specification and M&E drawings and specification. Connection into the existing LTHW heating system installation. Biomass boiler will act as primary boiler with natural gas boiler installation as assist and backup in event of failure/downtime of biomass boiler (including all necessary control configuration) Supply and sale of heat/fuel to school for set contract period in the form of wood pellet fuel and operation of the heating biomass boiler for 15 years
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 170000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
9
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no