II.1)
Scope of the procurement
Main Civils and Dredging Works for Ros an Mhíl Deep Water Quay, Ros an Mhíl Fishery Harbour Centre, Co. Galway
Reference number:
Ros an Mhíl FHC Deep Water Quay
45241100
-
Quay construction work
Works
II.1.4)
Short description
The works entails the construction of a new 200m long Deep Water Quay located adjacent to the existing Ros an Mhíl Fishery Harbour Centre (FHC), Co. Galway, together with rock blasting and dredging and recovery, to facilitate navigation to the quay.
The Works shall entail the main civils work in reclamation and construction of a new 200m long quay and associated facilities to accommodate the future mooring and operation of fishing vessels together with underwater drilling and blasting of approximately 35,000m³ of rock with dredging and recovery into the reclamation area behind the quay wall.
II.1.5)
Estimated total value
Value excluding VAT: 23700000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45111210
-
Blasting and associated rock-removal work
45111211
-
Blasting work
45111212
-
Rock-removal work
45241000
-
Harbour construction works
45244000
-
Marine construction works
II.2.3)
Place of performance
Main site or place of performance:
Ros an Mhíl, Co. Galway
II.2.4)
Description of the procurement
The proposed contract is to engage in the construction of a new 200m long Deep Water Quay located adjacent to the existing Ros an Mhíl Fishery Harbour Centre (FHC), Co. Galway, together with rock blasting and dredging and recovery, to facilitate navigation to the quay.
The Works subject under this contract shall entail the main civils work in reclamation and construction of a new 200m long quay and associated facilities to accommodate the future mooring and operation of fishing vessels together with underwater drilling and blasting of approximately 35,000m³ of rock with dredging and recovery into the reclamation area behind the quay wall.
The Works include but are not limited to site clearance, excavations, infilling, blasting rock, dredging and recovery of rock, reclamation using imported fill, reclamation using recovered dredged rock, quay wall construction, quay deck surfacing, service installations such as drainage, power, fuel and lighting, fencing and boundary works and all other associated civil engineering and mechanical and electrical works.
The Works shall be coordinated between an experienced rock dredging contractor and the main civils contractor (led by main civils contractor).
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 23700000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
24
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no