II.1)
Scope of the procurement
Full Turnkey of Battery Energy Storage System for LEU and Commercial Customers in Ireland and Great Britain
Reference number:
GWM13327A
Supplies
II.1.4)
Short description
ESB intends to enter into a single supplier framework for the Full Turnkey (design, supply, installation, commissioning, post handover remote monitoring and technical support, preventative and corrective maintenance) services and works capability of battery energy storage systems (BESS) & Maintenance which are to be deployed at the sites of large industrial / commercial customers in Great Britain (GB) and Ireland. These industrial sites are already included in an aggregated Demand Response Portfolio. The BESS will be integrated into and operated within the customers Demand Control System and an aggregated Demand Response Portfolio. The Battery Energy Storage system will be located “behind the meter” and each system will be typically 0.5 MW – 20 MW in size dependent on the load and grid connection of the customer.
II.1.5)
Estimated total value
Value excluding VAT: 1.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
yes
Tenders may be submitted for
all lots
Full Turnkey of Battery Energy Storage System for LEU and Commercial Customers in Ireland
Lot No:
1
II.2.2)
Additional CPV code(s)
71321000
-
Engineering design services for mechanical and electrical installations for buildings
71323000
-
Engineering-design services for industrial process and production
71330000
-
Miscellaneous engineering services
II.2.3)
Place of performance
II.2.4)
Description of the procurement
ESB intends to enter into a single supplier framework for the Full Turnkey (design, supply, installation, commissioning, post handover remote monitoring and technical support, preventative and corrective maintenance) services and works capability of battery energy storage systems (BESS) & Maintenance which are to be deployed at the sites of large industrial / commercial customers in Great Britain (GB) and Ireland. These industrial sites are already included in an aggregated Demand Response Portfolio. The BESS will be integrated into and operated within the customers Demand Control System and an aggregated Demand Response Portfolio. The Battery Energy Storage system will be located “behind the meter” and each system will be typically 0.5 MW – 20 MW in size dependant on the load and grid connection of the customer.
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
84
This contract is subject to renewal:
no
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged number of candidates:
7
II.2.10)
Information about variants
Variants will be accepted:
yes
II.2.11)
Information about options
Options:
yes
Description of options:
Details on any options will be provided in the tender documentation.
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
Full Turnkey of Battery Energy Storage System for LEU and Commercial Customers in Great
Lot No:
2
II.2.2)
Additional CPV code(s)
71321000
-
Engineering design services for mechanical and electrical installations for buildings
71323000
-
Engineering-design services for industrial process and production
71330000
-
Miscellaneous engineering services
II.2.3)
Place of performance
NUTS code:
UK -
UNITED KINGDOM
II.2.4)
Description of the procurement
ESB intends to enter into a single supplier framework for the Full Turnkey (design, supply, installation, commissioning, post handover remote monitoring and technical support, preventative and corrective maintenance) services and works capability of battery energy storage systems (BESS) & Maintenance which are to be deployed at the sites of large industrial / commercial customers in Great Britain (GB) and Ireland. These industrial sites are already included in an aggregated Demand Response Portfolio. The BESS will be integrated into and operated within the customers Demand Control System and an aggregated Demand Response Portfolio. The Battery Energy Storage system will be located “behind the meter” and each system will be typically 0.5 MW – 20 MW in size dependent on the load and grid connection of the customer.
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
84
This contract is subject to renewal:
no
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged number of candidates:
7
II.2.10)
Information about variants
Variants will be accepted:
yes
II.2.11)
Information about options
Options:
yes
Description of options:
Details on any options will be provided in the tender documentations.
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no