II.1)
Scope of the procurement
Energy Meter Data Capture and Meter Data Processing Solution with Support and Maintenance
Reference number:
ENQEIR781
72000000
-
IT services: consulting, software development, Internet and support
Services
II.1.4)
Short description
The objective of this PQQ process is to produce a short-list of suitably qualified Candidates who will be invited to tender for the provision of an Energy Meter Data Capture and Meter Data Processing Solution and the Support and Maintenance of same. Energy Meter Data is collected from transmission connected Generators, Interconnectors and Tie Line flow meters, and the SCADA system, and used by EirGrid and SONI for the purpose of Settlement and as Meter Data Provider obligations under the I-SEM Trading and Settlement Code. EirGrid and SONI currently use different energy meter data capture and data processing solutions. The scope of the project will include replacing the EirGrid system. It may include replacing the SONI system. This replacement may be done in parallel with the EirGrid implementation, after that implementation or not at all. A decision on the inclusion of SONI will be made when the regulatory funding position is fully established.
II.1.5)
Estimated total value
Value excluding VAT: 14000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
38551000
-
Energy meters
45317000
-
Other electrical installation work
72100000
-
Hardware consultancy services
72200000
-
Software programming and consultancy services
72211000
-
Programming services of systems and user software
72212000
-
Programming services of application software
72212100
-
Industry specific software development services
II.2.3)
Place of performance
II.2.4)
Description of the procurement
The objective of this PQQ process is to produce a short-list of suitably qualified Candidates who will be invited to tender for the provision of an Energy Meter Data Capture and Meter Data Processing Solution and the Support and Maintenance of same. Energy Meter Data is collected from transmission connected Generators, Interconnectors and Tie Line flow meters, and the SCADA system, and used by EirGrid and SONI for the purpose of Settlement and as Meter Data Provider obligations under the I-SEM Trading and Settlement Code. EirGrid and SONI currently use different energy meter data capture and data processing solutions. The scope of the project will include replacing the EirGrid system. It may include replacing the SONI system. This replacement may be done in parallel with the EirGrid implementation, after that implementation or not at all. A decision on the inclusion of SONI will be made when the regulatory funding position is fully established. The new system should capture Energy Metering Data, which is required for use by different business units within EirGrid (such as I-SEM, including Interconnector Settlement, TUoS and DS3 Services). It should be able to process meter data to ensure that the most accurate set of data is available for use. It should make this data available for the Business Units and Single Energy Market in appropriate formats through some form of customer meter data access facility. Ideally, it would also allow EirGrid give generators and other external parties access to their own meter data through a similar access facility. The single supplier Framework Agreement period will be for an initial duration of four years with the option to extend annually for up to an additional four years, subject always to the satisfactory performance of the supplier.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 14000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
48
This contract is subject to renewal:
no
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged number of candidates:
5
Objective criteria for choosing the limited number of candidates:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
yes
Description of options:
The initial contract period envisaged is 4 years with the possibility to extend annually up to a further 4 years, subject always to the satisfactory performance of the supplier.
The estimated spend of 14,000,000 EUR is taking into account the full duration of the contract including the possible extensions.
Under Article 51 as set out in Council Directive 2014/25/EU as transposed into Irish law by the European Union Award of Contracts by Utility Undertakings) Regulations 2016 (S.I. 286 of 2016) (the “Regulations”) there can be exceptional cases duly justified that allows the term of a framework agreement to exceed eight years. Given the complexity of EirGrid system set-up, any revenue metering system installed may become embedded into EirGrid’s systems architecture. This may lead to future contracts for continuous support. Therefore, EirGrid may award future contracts for continuous support up to the maximum allowed 20 years, subject always to the satisfactory performance of the supplier.
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no