Ballygiblin National School SWS 2022, Heating System Upgrade
Reference number:
201964
The project consists of the decommissioning and removal of the existing oil boiler and associated single pipe distribution network, and the installation of a new LPG cascade boiler configuration, a new two pipe distribution network that is future proofed and capable of supporting the integration of renewable heating solutions such as heat pumps, and compliant to current DoE TGD’s. The mechanical contractor must include for all electrical attendances, civil and builders works, and making good after installation.