Corrigendum

Information

Published

Date of dispatch of this notice: 29/06/2022

External Reference: 2022-269803

TED Reference: 2022/S 126-357698

Corrigendum

Corrigendum

Notice for changes or additional information

Works

Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)

Name and addresses

Tipperary Energy Agency
280878
Erasmus Smith House
Cahir
Tipperary
IE
Contact person: TEA TEA
Telephone: +353 0527443090
Fax: +353 0527443012
NUTS code:  IE -  IRELAND
Internet address(es):

Section II: Object

II.1)

Scope of the procurement

II.1.1)

Title

Ballygiblin National School SWS 2022, Heating System Upgrade
Reference number:  201964
II.1.2)

Main CPV code

45232141  -  Heating works
II.1.3)

Type of contract

Works
II.1.4)

Short description

The project consists of the decommissioning and removal of the existing oil boiler and associated single pipe distribution network, and the installation of a new LPG cascade boiler configuration, a new two pipe distribution network that is future proofed and capable of supporting the integration of renewable heating solutions such as heat pumps, and compliant to current DoE TGD’s. The mechanical contractor must include for all electrical attendances, civil and builders works, and making good after installation.

Section VI: Complementary information

VI.6)

Original notice reference

Notice number in the OJ S: 2022/S 116-323386

Section VII: Changes

VII.1)

Information to be changed or added

VII.1.2)

Text to be corrected in the original notice

Section number:  IV.2.2
Place of text to be modified:  Time limit for receipt of tenders or requests to participate
Instead of:  
Date:  27/06/2022
Local time:  13:00
Read:  
Date:  01/07/2022
Local time:  13:00
VII.2)

Other additional information

Extension of Return of Tender to 01.07.2022 @ 13:00