II.1)
Scope of the procurement
N24 Bearys Cross Road Improvement Scheme
45000000
-
Construction work
Works
II.1.4)
Short description
The proposed scheme is located on the N24/R513 junction known as Bearys Cross, the proposed scheme comprises of the construction of a four-arm controlled roundabout junction, construction of realigned road, Pavement Works, Earthworks, Drainage & attenuation, Bridge construction crossing of the Groody River, fencing, landscaping, footpaths, public lighting, accommodation works and other ancillary site works.
II.1.5)
Estimated total value
Value excluding VAT: 5000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45233000
-
Construction, foundation and surface works for highways, roads
45233100
-
Construction work for highways, roads
45233120
-
Road construction works
45233140
-
Roadworks
63712700
-
Traffic control services
II.2.3)
Place of performance
NUTS code:
IE051 -
Mid-West
Main site or place of performance:
Limerick
II.2.4)
Description of the procurement
The proposed scheme is located on the N24/R513 junction known as Bearys Cross, the proposed scheme comprises of the construction of a four-arm controlled roundabout junction, construction of realigned road, Pavement Works, Earthworks, Drainage & attenuation, Bridge construction crossing of the Groody River, fencing, landscaping, footpaths, public lighting, accommodation works and other ancillary site works.
Criteria below
Cost criterion
-
Name:
Fixed Price Lump Sum adjusted by the tendered rates as set out in Tender documentation (Lowest Comparative Tender)
/
Weighting:
100%
Value excluding VAT: 5000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
12
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no