Extension of the existing quay wall at Killybegs F.H.C in the vacinity of Smooth Point which will include the construction of new combined quay wall structure, dredging in rock and removal of dredged rock to a storage site within Killybegs F.H.C. Construction of a piled releaving slab and installation of associated services.
II.1.5)
Estimated total value
Value excluding VAT: 10000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
44212400
-
Piling
44212410
-
Sheet piling
45000000
-
Construction work
45200000
-
Works for complete or part construction and civil engineering work
45240000
-
Construction work for water projects
45241000
-
Harbour construction works
45244000
-
Marine construction works
45252124
-
Dredging and pumping works
II.2.3)
Place of performance
NUTS code:
IE041 -
Border
Main site or place of performance:
Killybegs Fishery Harbour Centre
II.2.4)
Description of the procurement
Extension of the existing quay wall at Killybegs F.H.C in the vacinity of Smooth Point which will include the construction of new combined quay wall structure, dredging in rock and removal of dredged rock to a storage site within Killybegs F.H.C. Construction of a piled releaving slab and installation of associated services.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 10000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
7
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no