II.1)
Scope of the procurement
Development of Cost Optimal Calculations and Gap Analysis for Directive 2010/31/EU on the European Performance of Buildings (Recast)
71241000
-
Feasibility study, advisory service, analysis
Services
II.1.4)
Short description
Cost Optimal Calculations are required to be carried out in accordance with:
• Directive 2010/31/EU of the European Parliament,
• Commission Delegated Regulation (EU) No 244/2012 of 16 January 2012 supplementing Directive 2010/31/EU of the European Parliament and of the Council on the energy performance of buildings by establishing a comparative methodology framework for calculating cost-optimal levels of minimum energy performance requirements for buildings and building elements
• the Guidelines accompanying Commission Delegated Regulation (EU) No 244/2012 of 16 January 2012 supplementing Directive 2010/31/EU of the European Parliament and of the Council on the energy performance of buildings by establishing a comparative methodology framework for calculating cost-optimal levels of minimum energy performance requirements for buildings and building elements and of the Council of 19th May 2010 on the energy performance of buildings (recast), (2012/C 115/01)