II.1)
Scope of the procurement
Multi Disciplinary Consultancy Design – Glounthaune to Midleton Double Tracking Project
Reference number:
7786
71311300
-
Infrastructure works consultancy services
Services
II.1.4)
Short description
Iarnród Éireann require the services of a multi-disciplinary consultant to carry out the preliminary design/planning, detailed design and construction phases of key elements of the larger Cork Area Commuter Rail Programme. The scope of the proposed contract will include the Double Tracking of the Glounthaune to Midleton Line and other associated works. The contract will comprise all elements of design including permanent way, signalling, civil, structural and environmental design as well as quantity surveying and planning services.
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
71240000
-
Architectural, engineering and planning services
71311000
-
Civil engineering consultancy services
71311230
-
Railway engineering services
71312000
-
Structural engineering consultancy services
71313000
-
Environmental engineering consultancy services
71313100
-
Noise-control consultancy services
71313400
-
Environmental impact assessment for construction
71315210
-
Building services consultancy services
71316000
-
Telecommunication consultancy services
71322000
-
Engineering design services for the construction of civil engineering works
71322100
-
Quantity surveying services for civil engineering works
71351200
-
Geological and geophysical consultancy services
71520000
-
Construction supervision services
71530000
-
Construction consultancy services
72224000
-
Project management consultancy services
79415200
-
Design consultancy services
79416200
-
Public relations consultancy services
79417000
-
Safety consultancy services
79418000
-
Procurement consultancy services
79933000
-
Design support services
II.2.3)
Place of performance
II.2.4)
Description of the procurement
Iarnród Éireann require the services of a multi-disciplinary consultant to carry out the preliminary design/planning, detailed design and construction phases of key elements of the larger Cork Area Commuter Rail Programme. The scope of the proposed contract will include the Double Tracking of the Glounthaune to Midleton Line and other associated works. The contract will comprise all elements of design including permanent way, signalling, civil, structural and environmental design as well as quantity surveying and planning services.
II.2.5)
Award criteria
( Agree to publish? yes )
Criteria below
Quality criterion
-
Name:
Methodology for the undertaking the design development process for RAilway Electrification Supply & Infrastructure
/
Weighting:
3%
Quality criterion
-
Name:
Methodology for the undertaking of the Design Development Railway Signalling & Telecommunications
/
Weighting:
3%
Quality criterion
-
Name:
Methodology for the undertaking of the Design Development Railway & Road Civil Engineering Features & Structures
/
Weighting:
7%
Quality criterion
-
Name:
Proposed methodology for the management of the Railway Order process
/
Weighting:
10%
Quality criterion
-
Name:
Proposed methodology for cost management.
/
Weighting:
2%
Quality criterion
-
Name:
Identify critical issues in forming a procurement strategy for the delivery of the works
/
Weighting:
2%
Quality criterion
-
Name:
Proposed Delivery Programme
/
Weighting:
4%
Quality criterion
-
Name:
Proposed Corporate Governance Systems
/
Weighting:
2%
Quality criterion
-
Name:
Proposed methodology for the provision of Design Support during the Construction Phase
/
Weighting:
2%
Quality criterion
-
Name:
Proposed Project Team
/
Weighting:
15%
Price
-
Weighting:
50%
II.2.11)
Information about options
Options:
yes
Description of options:
The successful tenderer may be required to carry additional services related to the design that becomes apparent during the design and planning process that would not have been apparent before going to tender, These could be as a result of planning conditions that would impact on the environment, such as noise, ground conditions, wildlife factors, or safety matters that could impact on the railway and its rolling stock.
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
yes
Identification of the project:
EU Resilience and Recovery Facility Funding