II.1)
Scope of the procurement
St Kevin's Cork Phase One
Reference number:
Pro092
45211340
-
Multi-dwelling buildings construction work
Works
II.1.4)
Short description
The St Kevin’s Hospital development is a key strategic project located in Cork city, Ireland and is part of the LDA’s wider mandate to develop a range of housing options, including affordable sale, cost rental and social housing. Planning permission has been granted for a new residential development on the Site (hereinafter defined), with delivery to be sequenced on a phased basis. The works defined within this document comprise the Phase 1 development works only (the “Project”).
The St Kevin’s Hospital Phase 1 development will consist of circa 9,980 sqm NIA of accommodation. It will deliver 97 no. new homes, comprising of a mix of 37 no. 3 and 4 bed terraced houses, 30 no. duplex ground floor apartments, 30 no. duplex upper townhouses, all ranging in height from 2 to 3 stories. The new neighbourhood will provide “homezones”, on street parking, tree planting, and open spaces that seamlessly connect throughout the development.
II.1.5)
Estimated total value
Value excluding VAT: 25000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45000000
-
Construction work
45210000
-
Building construction work
45211000
-
Construction work for multi-dwelling buildings and individual houses
45211100
-
Construction work for houses
II.2.3)
Place of performance
Main site or place of performance:
Cork
II.2.4)
Description of the procurement
The St Kevin’s Hospital development is a key strategic project located in Cork city, Ireland and is part of the LDA’s wider mandate to develop a range of housing options, including affordable sale, cost rental and social housing. Planning permission has been granted for a new residential development on the Site (hereinafter defined), with delivery to be sequenced on a phased basis. The works defined within this document comprise the Phase 1 development works only (the “Project”).
The St Kevin’s Hospital Phase 1 development will consist of circa 9,980 sqm NIA of accommodation. It will deliver 97 no. new homes, comprising of a mix of 37 no. 3 and 4 bed terraced houses, 30 no. duplex ground floor apartments, 30 no. duplex upper townhouses, all ranging in height from 2 to 3 stories. The new neighbourhood will provide “homezones”, on street parking, tree planting, and open spaces that seamlessly connect throughout the development.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 25000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
20
This contract is subject to renewal:
no
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged number of candidates:
5
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no