II.1)
Scope of the procurement
Construction of a new pedestrian and cycle bridge in Galway City
Reference number:
2021-COR-SWB-WORKS
45221113
-
Footbridge construction work
Works
II.1.4)
Short description
Construction of a new pedestrian and cycle bridge 24m downstream of the existing Salmon Weir Bridge in Galway City
II.1.5)
Estimated total value
Value excluding VAT: 5000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45000000
-
Construction work
45200000
-
Works for complete or part construction and civil engineering work
45220000
-
Engineering works and construction works
45221100
-
Construction work for bridges
45221110
-
Bridge construction work
45221113
-
Footbridge construction work
45221115
-
Construction work for steel bridges
45233162
-
Cycle path construction work
II.2.3)
Place of performance
II.2.4)
Description of the procurement
GCC are constructing a new pedestrian and cycle bridge over the Lower River Corrib circa 25m downstream of the existing Salmon Weir Bridge. The bridge will link Gaol Road (west) to Newtownsmith (east) in Galway City.
The scheme is a 3no. span bridge constructed over the Lower River Corrib, Mill Race and Waterside Canal. The new bridge structure will tie into the existing footpaths on Gaol Road and Newtownsmith Road. The main span is circa 50m, with approaches 13.5 & 18.5m.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 5000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
18
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information