II.1)
Scope of the procurement
The N69 Listowel Bypass consists of 3.65km of offline road construction as well as the online upgrade of 2.30km of an existing section of urban road.
Reference number:
N69 Listowel Bypass
45220000
-
Engineering works and construction works
Works
II.1.4)
Short description
The proposed N69 Listowel Bypass consists of both new, offline road construction as well as the online upgrade of an existing section of urban road, the John B. Keane Road section of the R553/N69.
II.1.5)
Estimated total value
Value excluding VAT: 30000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
45221110
-
Bridge construction work
45221111
-
Road bridge construction work
45233000
-
Construction, foundation and surface works for highways, roads
45233100
-
Construction work for highways, roads
45233120
-
Road construction works
II.2.3)
Place of performance
Main site or place of performance:
Co Kerry
II.2.4)
Description of the procurement
The proposed N69 Listowel Bypass consists of both new, offline road construction as well as the online upgrade of an existing section of urban road, the John B. Keane Road section of the R553/N69. The new, offline section will consist of a single carriageway road situated to the west of the town, approximately 3.65km in length. The online upgrade of the existing John B. Keane Road section of the R553/N69 is approximately 2.30km in length. The existing John B. Keane Road section of the R553 will be re-classified as the N69 upon completion of the scheme. In total, the development is 5.95km in length.
Specific elements of the scheme include, but are not limited to;
• 3 no. new roundabout junctions and associated improvements to regional and local roads;
• Provision of 19 no. structures including a new bridge spanning the River Feale, tied sheet pile wall, accommodation underpasses, flood culverts and watercourse crossings;
• Urban realm improvements and an upgrade of vulnerable road user facilities on John B. Keane Road;
• Working within, and adjacent to, designated areas; and
• All other aspects of road design including site clearance, drainage, earthworks, pavement, safety barriers, signing and lining, public lighting, utilities diversions, fencing and boundary treatments, accommodation works and landscaping.
Value excluding VAT: 30000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
36
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no
II.2.14)
Additional information
Tender process for construction of the N69 Listowel Bypass