Corrigendum

Information

Published

Date of dispatch of this notice: 29/04/2021

External Reference: 2021-257548

TED Reference: 2021/S 086-221586

Corrigendum

Corrigendum

Notice for changes or additional information

Works

Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)

Name and addresses

Westmeath County Council
N/A
Áras An Chontae, Mountstreet, N91 FH4N
County Westmeath
Mullingar
IE
Contact person: Darren Fulham
Telephone: +353 4442150
NUTS code:  IE -  IRELAND
Internet address(es):

Section II: Object

II.1)

Scope of the procurement

II.1.1)

Title

Prequalification of Contractors (and PSCS) for the Construction of the Athlone Cycle and Pedestrian Bridge over the River Shannon
Reference number:  WH 9903_ Cycleway Bridge Athlone
II.1.2)

Main CPV code

45221119  -  Bridge renewal construction work
II.1.3)

Type of contract

Works
II.1.4)

Short description

Prequalification of Contractors (and PSCS) for the Construction of the Athlone Cycle and Pedestrian Bridge over the River Shannon
The National Roads Office of Westmeath County Council are inviting submissions from contractors to prequalify through a Suitability Assessment Questionnaire in the First Stage of the restricted tender procedure for the Construction of the Athlone Cycle and Pedestrian Bridge over the River Shannon
This pre-qualification is for the Construction of the Athlone Cycle and Pedestrian Bridge over the River Shannon which is a key component of the Galway to Dublin Cycle route which ensures a segregated cycleway crossing that provides easy passage and, critically, safe access through the town of Athlone which is seen as a halfway point along the proposed Galway to Dublin Cycleway.

Section VI: Complementary information

VI.6)

Original notice reference

Notice number in the OJ S: 2021/S 013-026662

Section VII: Changes

VII.1)

Information to be changed or added

VII.1.2)

Text to be corrected in the original notice

VII.2)

Other additional information

Change to Tender return dates