II.1)
Scope of the procurement
Civil Structural Engineering Services for Additional Accommodation at CBS, Mitchelstown
Reference number:
62420V
71318000
-
Advisory and consultative engineering services
Services
II.1.4)
Short description
Civil Structural Engineering Services for Additional Accommodation at CBS, Mitchelstown, Co Cork. CBS Mitchelstown is a voluntary secondary school under the trusteeship of The Edmund Rice Schools Trust.
Please see attached Project Brief & Schedule of Additional Accommodation
In summary, the project will comprise:
Section A:
• 1 x Technologies Prep Room 58.6 m2 each
• 1 x DCG room 88.6m2
• Student & staff toilets 8 m2
• Locker Space 72 m2
Giving a floor area incl circulation and internal walls of: 201 m2
Section B
• 3 Classroom SEN Base 507 m2
• Giving a floor area (incl circulation and internal walls of 649.7m2
Giving a Gross Floor Area for Section A & B (including circulation, internal walls & stairs 951 m2
Also:
• Secure Hard and soft play area 200 m2
• Sensory Garden 100 m2
• 9 parking spaces
Also:
• Demolition of Existing Prefab 100 m2
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Lowest offer:
48024.00
EUR
/
Highest offer:
59409.00
EUR
taken into consideration
(excluding VAT)
II.2.2)
Additional CPV code(s)
71300000
-
Engineering services
71310000
-
Consultative engineering and construction services
71311000
-
Civil engineering consultancy services
71312000
-
Structural engineering consultancy services
71320000
-
Engineering design services
II.2.3)
Place of performance
Main site or place of performance:
Co Cork, Ireland
II.2.4)
Description of the procurement
Civil Structural Engineering Services for Additional Accommodation at CBS, Mitchelstown, Co Cork. CBS Mitchelstown is a voluntary secondary school under the trusteeship of The Edmund Rice Schools Trust.
Please see attached Project Brief & Schedule of Additional Accommodation
In summary, the project will comprise:
Section A:
• 1 x Technologies Prep Room 58.6 m2 each
• 1 x DCG room 88.6m2
• Student & staff toilets 8 m2
• Locker Space 72 m2
Giving a floor area incl circulation and internal walls of: 201 m2
Section B
• 3 Classroom SEN Base 507 m2
• Giving a floor area (incl circulation and internal walls of 649.7m2
Giving a Gross Floor Area for Section A & B (including circulation, internal walls & stairs 951 m2
Also:
• Secure Hard and soft play area 200 m2
• Sensory Garden 100 m2
• 9 parking spaces
Also:
• Demolition of Existing Prefab 100 m2
INTERIM TEMPORARY ACCOMMODATION
• Please note: Once appointed, the Design Team (DT) will be tasked with the provision of interim temporary accommodation (100 m2), including all required statutory approvals and compliances, to be used by the school until such time that the permanent structure has been completed. The DT are to ensure that the location of the interim temporary accommodation does not impede the development of the permanent additional accommodation.
Criteria below
Quality criterion
-
Name:
Criterion C
/
Weighting:
25%
Price
-
Weighting:
75%
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no