II.1)
Scope of the procurement
Provision of Waterford Metropolitan Area Transport Strategy
71311200
-
Transport systems consultancy services
Services
II.1.4)
Short description
The core objective of the Services is to develop a transport strategy (Transport Strategy) for the Waterford Metropolitan Area (WMA) covering the period 2020 to 2040, and addressing all land transport modes. The objective of the Transport Strategy is to provide a long-term strategic planning framework for the integrated development of transport infrastructure and services in the WMA.
It is envisaged that this Contract will be awarded in Q1 2020 and that a draft Transport Strategy will be completed by Q3 2020. A further four month period is envisaged for public consultation and for amendments arising from that consultation to be incorporated in the final version of the Transport Strategy. The finalised Transport Strategy is expected to be completed ten months after the commencement of the Services
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
Value excluding VAT:
199865.00
EUR
II.2.2)
Additional CPV code(s)
60000000
-
Transport services (excl. Waste transport)
71300000
-
Engineering services
71310000
-
Consultative engineering and construction services
71311000
-
Civil engineering consultancy services
71311210
-
Highways consultancy services
71311220
-
Highways engineering services
71311300
-
Infrastructure works consultancy services
71318000
-
Advisory and consultative engineering services
71320000
-
Engineering design services
II.2.4)
Description of the procurement
The core objective of the Services is to develop a transport strategy (Transport Strategy) for the Waterford Metropolitan Area (WMA) covering the period 2020 to 2040, and addressing all land transport modes. The objective of the Transport Strategy is to provide a long-term strategic planning framework for the integrated development of transport infrastructure and services in the WMA.
It is envisaged that this Contract will be awarded in Q1 2020 and that a draft Transport Strategy will be completed by Q3 2020. A further four month period is envisaged for public consultation and for amendments arising from that consultation to be incorporated in the final version of the Transport Strategy. The finalised Transport Strategy is expected to be completed ten months after the commencement of the Services
Criteria below
Quality criterion
-
Name:
Proposed approach to address critical issues and deliver the optimal outcome
/
Weighting:
40
Quality criterion
-
Name:
The experience and qualifications of the key members
/
Weighting:
30
Price
-
Weighting:
30
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no